Laserfiche WebLink
��� <br /> D�x <br /> C H <br /> � Hrn <br /> y� � � <br /> ��� , <br /> � x� � <br /> � <br /> 0 <br /> ��, g � <br /> N �> y area :;uring heavy storm periods will be precipitated out into <br /> rty y y th� lower reaches of the wetland prior to their leaving the <br /> �Qt7v�+i site in the storm drainage system. <br /> ��1�y By providing this element, the wetland mitigation area <br /> o� will act as a secondary purifier for the water prior to it <br /> entering the city storm water system. This will reduce some <br /> pressure on the downstream wetlands that have been designed to <br /> separate out sediments prior to the water being discharqed <br /> into "Waters of the state" or "Waters of the United States" . <br /> 9. Construction Procedures. <br /> � <br /> The majority of the �rocedures that have been discussed <br /> in the design plan are: <br /> t l . The area will be constructed concurrent with <br /> '�1 grading of the site and the cons;:ruction of 1 or more of the <br /> buildings . c"i� �r. , i • � . � : , . . . <br /> '�' . 'i/� - � . .-/ � . '. . . �... .- .� . r- ... . <br /> . ,�,. . �.�.. / ...� �./ .. � . ..:�-�- <br /> '�' 2 . All trees and shrubs that are proposed to be /�/I�:i�� <br /> ' ' salvaged will be ear-marked , removed , and placed in an - • ; <br /> � appropriate nursery location forireplantingjupon completion of � ' <br /> '�' the grading. - ' � / ; <br /> rl��I�/�,{ i.�i <br /> ��� 3 . The site will be over excavated and back filled o <br /> � with top soil . �, , <br /> ' ' � <br /> ' 4 . The base material in the northwest wetland will be '� �� � <br /> � excavated and spread in those areas of elevation 562 or less � " �� <br /> �' with the exception of the existing wetlands which will be <br /> ' retained undisturbed. <br /> f� 5. Shrubs and trees will be either replanted or <br /> � introduced , depending on the species , starting with the <br /> 1�' interior trees on the elevation 565 , 564, and 563 areas and <br /> ending with the planting of the buffer �a�ea. Trees that are <br /> handled by heavy equipment will be planttd first. All trees <br /> 10 feet or taller will be staked and anchored using self- <br /> destructive materials such as cotton twine or cloth. Each <br /> 1 <br /> � 7 <br />