Laserfiche WebLink
wmmyeity, thete will be a reducdon in the number of new families <br /> moving to tt►e impacted uea. <br /> b. The State of Washington has historically recognized some responsibility to <br /> assist local communitiea in addresin6 impacu rssulting from xonomic <br /> developmrncs of sratewide significance. This eacpansion proposal clearly <br /> maaa a rea+onable tcst of aignificance in terms of Boeing's relative <br /> imporunae to the state'a ec�eomy (Iar`est employa) and in terms of the <br /> sub�tantisl net reva►ue which will be genaarod co the state by the proposal. <br /> Boeing, in turn, hu u► obligation ro facus iu rnntidecable influence on <br /> mauen of stue policy coward developing a state impact assisronce program <br /> in conjunction wich the host communiry. Such a prosam will include housing <br /> as one of the significant impscu resulting fcom the proposal. Baeing will <br /> auist in the devdopmmc of an imput usistance progtam to help the local <br /> communiriea oifset some of the impuu as�ociated with the proposal including <br /> housing. In addidon, Boeing a�ill acdvely support the inclusion of such <br /> impact assiatance language as an amendment to the Growch Dianagement Act. <br /> RCW 36.70A RCW. <br /> c. The City of Evetett agroes to review iu procedures and ordinances to <br /> determine what additional steps the City can taloe to encoucage and facilitau <br /> inciea�ed housing availability for low and madaate income familia. The <br /> City enoounga other local govemments in the Impact Area to work <br /> individually and collectively toward that end. <br /> Thae impacu and midgadon masurea will be manitored by the Boeing <br /> Mitigation Commictee which shall detetmine if the meuures prexribed aze <br /> in place. The Commiaa shall have the authority ro ta�e a numbet of <br /> mnsuns to insure that the mirigadon maaures ue met. Thae masures <br /> indude, but are not limited to, discussions with Boeing regardin6 the <br /> mitigaoion prognm and remadies which can be talmn to address any issues or <br /> deficimcia, deniai of occupancy permia, stop worlc on exisbng permits and <br /> halting the iuuance of futiue permics. <br /> B. PUBLIC SERVICES <br /> L On-Site Lmoacta and Mitiaetion <br /> g, Pe[kS and Rrrration (l�od�od Shoielim u�e: Public Servica: Utititia) <br /> The Haeing Everca Facility provida four ball fields on iu site for the eacclusive <br /> use of its employaa. The Expuision will cawe diacupdon i�f fidd use during <br /> conatruction. In �ddidon, pcwiding che 9,300 new employees with compa�able <br /> access w fields will rcquire the equivalent of two additional fields. Failure to <br /> 46 <br />