Laserfiche WebLink
� <br /> � that portion of the channel to warrant providing access depending on how the infiltration <br /> system is designed. <br /> � 10) Control Eroslon in arcas ncar Scaway F31vd <br /> � Unauthorized use of off-road vehicles and motorrycles is causing erosion on both side <br /> of Seaway Blvd adjacent to the Creek. Boeing proposes to hydroseed the areas to <br /> encourage reestablishment of vegetation. 7lie area on Boeing lands will be fenced to <br /> � exclude vehicles. Boeing will cooperate with other owners in fencing their properties, but <br /> will not bear the costs of fencing ocher ownership. <br /> r � <br /> 'Ihe outlined actions result in providing access for anadromous Csh into up to about <br /> , � 7,9001ineal feet of stream habitat suitable for who salmon and cutthroat trout. The exact <br /> ; length of channel available above Seaway Boulevard may vary depending on tlow in the <br /> channel (see action 9 above).Approximately 1200 fcet of the 7900 foot reach presently hosts <br /> � fish. Considering the 6700 foot :ec�ion tnat presently does not contain fish, the pro�+osed <br /> actions provide nearly twice the length of the potential habitat that will be lost due to the <br /> proposed action. Further, the width and flows in Powder 1�till Gulch Creek average much <br /> � greater than in the impacted channels, therefore even greater mitigation is being provided <br /> than indicated by the comparison of stream length. <br /> � PERFORI�IANCE STANDARDS <br /> In the Wetland Pond, fish must be present. The intent is to have a population of <br /> cutthroat trout that is maintained by artiCcial means (stocking). if trout can not survive on <br /> � a yeur•round basis,other species will be considcr for the pond after consultation with WDW. <br /> For Powder Mill Gulch Creek, the stream must provide hahitat for fishes. A selt- <br /> � sustaining run of anadromous �sh is desired, howe��o:, this is too high of a performance <br /> standard when mitigating for potentiai habitat that �s not row occupied, and considering the <br /> uncertainry of establishing runs that may be subjected to intensive �sheries that are beyond <br /> � the control of the project proponent. Therefore, the performance standard is that the <br /> stream must be capable of producing coho smolts and cutthroat trout in a substantial <br /> portion of iu length. This performance standard allows arti�cial stocking to maintain the <br /> � populatior, if required. <br /> MONITORINC PROGRA�t <br /> 1 The Wetland Pond will be sampled by an appropriate technique to ascercain whether <br /> cutthroat trout aze surviving. Annual surveys will be conducted during the early fall for five <br /> � years. At the end of this period a decision will be made regarding the suitabiliry of the <br /> habitat. The fve year period is intended to allow evaluation over several summers to factor <br /> in climatic variability into the decision. If failure is indicated prior to the end of the five <br /> tyeaz period contingency actions may be implemented. <br /> In Powder Mill Gulch Cr-ek, electrofishing will be conducted in reaches spaced <br /> 1 throughout the stream during late summer and late winter. The intent of the efforts is to <br /> ' - 23 <br />