. IULY 1994 <br /> DOEING FUEL DOCK TRENCH DRAIN <br /> 1. Thc Owner reserves the right to occupy and to place and install equipment in <br /> � " completed areas prior to substantial completion provided that such occupancy <br /> does not interfere with completion of the work. Such placing of equipment <br /> and partial occupancy shall not constimtc acceptancc of the rotal work. <br /> i � <br /> � � 1.5 WORK SEQUENCE: <br /> p. General: Construction sequence shall be determined by Contractor based on phasing <br /> i ;, as shown on construction documents. <br /> B. Continuous Service to Existing Facilitia: Where the work is on or adjacent to <br /> i , existing facilities, ezercise caution and schedule operations to ensux that fuhctioning <br /> of present facilities will not be endangered. Shutdown of Owner's operating facilities <br /> to perform the work shall be held to a minimum length of time and shall be <br /> coordinaled wilh Owner who shall have control over thc timing and schedules of such <br /> shutdowns. <br /> 1.6 CONTRACTOR'S SUBMITTALS: <br /> p, Submittal Recipient: Submit submittals to Owner's Authorized Representative. <br /> g. In addition lo the submittals required by individual specification sections, submit the <br /> tollowing in accordance with tne e:ontract Documents and Sxtion 01300: <br /> 1. Construction Schedule. <br /> 2, Progress Reports. <br /> 3, Contractor's Price Breakdown (Schedule of Velues): Report that ties wsts ro <br /> increments of the Construction Schedule and Progress Report. <br /> � 4. Copy of the SWPPP as definc� in this section. <br /> i F. Outline of wnstruction sequence (phasing) oF the general and subcontract work as <br /> shown on the consln�ction documents. Submit for review prior to commencing work <br /> at the site. <br /> G, Quality Control Plan: Submit for review prior to cortunen�i�B Work at the site a <br /> Quality Control Plan embracing the following elements (end other appropriate items). <br /> 1. Introduction. <br /> 2, Constcuclion Organizetion. � <br /> 3. Quality Assurance Program. <br /> 4. Document Control. <br /> $, Material Receiving and Storage. <br /> (, Training and Certification. <br /> 7, Control of Measuring and Testing Equipment. <br /> 8. Audits. <br /> g. Control of Special Processes and Coordination. <br /> �p, Quality Verification Records. <br /> �1, Quality Assurance Procedures. <br /> 12. Fomu and Exhibits. <br /> 01010 - 2 <br /> SUMMARY OF WORK <br />