Laserfiche WebLink
a DOEING FUEL DOCR TRCNCH DRA(N IULY 19 4 <br /> � � <br /> 1.7 LIST OF DRAWINGS: <br /> A. Drawings List: <br /> - 1, Each sheet of the Contract Drawings bears the following general titir. <br /> Posilions F-1, F-2 and F-3. <br /> 2, Individual shcet numbers and titles are stated on indez cover shcet under <br /> � , "C;zwings List." <br /> 1.8 EMERGENCY UTILITY TELEPHONE: <br /> I p, Notify Bceing dispatch offia immediately (942-2944) and the Owner's Authorized <br /> Repraentative in the event an existing utility service is accidentally cut or broken. <br /> PART 2 - PRODUCTS - NOT APPL[CABLE <br /> PART 3 - EXECUTION: <br /> 3.1 SWPPP CONTENTS AND REQUIREMENTS: <br /> p. Contractor shall have a Stocm Water Pollution Prevention Plan(SWPPP) describing <br /> stabiliration and structural practices, both of which shall be implemented to minimize <br /> erosion and the transport of sediments. This plan will comply with the Boeing site <br /> NPDES Storm Water Pollution Control Plan. contractor's obligations shall include but <br /> aro not limited to: <br /> ], An Erosion and Sediment Control Plan shall include a description of <br /> stabiliution Best Management Practices (BMPs), including sito-specific <br /> scheduling of lhe implementation of the practices. Stabiliudon measures shall <br /> be initiated as soon as pncticable in portions of the site where construction <br /> activities have temporati�Y or P��ma�°°dY ��' Th0 P��shall ensuro that <br /> , - the following requirements are satisfied: <br /> a, p�� exposed and unwotked soils shall be stabilized by suitable and <br /> timely application of BMPs. <br /> b. Existing vegetation should be praerved where attainable. In the field, <br /> mark areas which arc not to be disturbed, including setbacks, <br /> sensitivdcritical aras end theit buffers, tras, and drainage courses. <br /> c. Cut and fiil slopes shall be designed and consttucted in a manner that <br /> will minimiu erosion. Slopes shail be stabiliud in accordance with <br /> requircment 1. above• <br /> d. Stabiliration adequate to prevent erosion of outlets and adjacent stream <br /> banks shall be provided at the outlets of all conveyance syatems. <br /> e, All storm drain inlets made operable during const�uction shall be <br /> properly maintained. <br /> {, Whetever constniction vehi�le access routes intersect paved roads, <br /> provisions must be made to minimiu the transport of sediment (mud) <br /> onto the paved road. if sediinent is transported onto a road aurface, <br /> the road adjacent to the construction site shaii be cleaned on a tegular <br /> OIOlO - 3 <br /> SUMMARY OF WORK <br />