Laserfiche WebLink
ia <br /> $OGING FUEL DOCK -TRENCH DRAiN IULY 1994 <br /> � � 5. Fortnat: The Erosion and Sediment Control Plan shall consist of two parts: a <br /> nanative and a set of site plans. Permittees may rcfer to Chapter II-4 of <br /> Ecolagy's SWMM for guidance on the conrent and fortnat. <br /> �; 6. Control of Pollutants Other Than Sediment on Constcuction Sites: All <br /> pollutants other than sediment that occur on-site during construction shall be <br /> handled and disposed of in a manner that does not cause contamination of <br /> ' ° storm water. Chaptet il-3 of Ecoloav'a Stormwater M��aeement M����al for <br /> the Pueet Sound Basin (SWMM), can be refercnced for giiidance in <br /> controlling other potential pollutants. <br /> ia <br /> 7. Coordination with L.acal Requirements: This pertnit dxs not relieve the <br /> � � pertnitta of complisnce with any morc stringent requirem�nts of local <br /> govemment. As required by the Puaet Sound Water Oualltv M�".a e�ment <br /> �q, local govemments within the Puget Sound Hesin are to adapt minimum <br /> � requirements Por consttuction which are at least equivalent b the 15 minlmum <br /> requirements listed in Chapter I-2 of Ecology's SWMM. Where Ecology has <br /> detetmined such local requirements to be equivalent, wmpliance with the local <br /> requirements meets the requirements of this permit. <br /> END OF SECTION 01010 <br /> IA <br /> SUMMARY OF WORK 01010 - 5 <br />