My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
DRAINAGE TRENCH FOR FUEL DOCKS
>
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 2:11:57 PM
Creation date
1/25/2017 2:11:09 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
DRAINAGE TRENCH FOR FUEL DOCKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOEING rUEL DOCK- T ENCH DRAIN <br /> JULY 1 4 <br /> 3• Clarifications, intecpretations, corrections and changes wi11 be made by besign <br /> Change Notice (DCN). <br /> 4• Changes, ciarifications and interpretations made in any other manner than <br /> above will not be binding and are unreliable. <br /> C• Questions which arise during constcuction concerning the Contract Documents shail be <br /> submitted by Contractor to Owuc;'s Authorized Representativc in writing on an <br /> approved form•to the Engineer for its comments and reply. <br /> �• Substitutions: <br /> 1• Substitutions arc requesta far changes in manufacturers, products, materials, <br /> equipment, or aysterrs rcquired by the Contract Documents proposed by thc <br /> Contractor. Submit substitution request in RFI focmat with required <br /> infortnation as lisled be�ow, Akcr review and approval submit fortnai <br /> submittal. <br /> z• Substitutions will be :onsidered when request is timely, fully documented, <br /> properly submitted, yyd one af the following conditlons are satisficd: <br /> e• SPa��ed manufacturer, product, material, equipment or system cannot <br /> ��cej�e �ecessary approval by a governing authority and requested <br /> substitution can be approved. <br /> b• SPM�f�d manufacturcr, product, material, equipment or system cannot <br /> be provided in manr�a� that is compatible with other materials, and <br /> where Contractor certifies that substitution will overcome <br /> incompatibility. <br /> �• When all of the products listed in the Contract Docwrients for a <br /> specified item an no longer being manu(actured� or when products are <br /> not listed and all of the confortning products of manufacturers listed in <br /> the Contract Documenta for a apecified item aro no longer being <br /> �a""Cactured, then submit written explanation of each situation along <br /> with name of another product and manu(acturer for review and <br /> epproval by Submittal Reviewer. <br /> 3' BY m���8 rc9uests for substitution, Contractor: <br /> a• R�P����s that Contracror has peraonally investigated proposed <br /> substitution and detertnined that it is eq�a� to or superior in all <br /> ,rcspects to that specified. <br /> b• Represents that Contractor will provide the same warranty for <br /> substitutions that Contractor would for that specified, <br /> �• Cenifies that cost data presented is complete and includes all related <br /> costs under thia Contract except ArchitecdEnginar'a redesign costs, <br /> � W81V� a�� ��a�ms for additional costs rclated to the substitution <br /> which subsequently become apparent. <br /> d• :Wi�� coordinate installation of accepted substi[ution, making such <br /> changes as may be rcquired (or �hc work to be complete in all <br /> respects. <br /> SUBMITTALS <br /> 01300- 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.