My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
DRAINAGE TRENCH FOR FUEL DOCKS
>
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 2:11:57 PM
Creation date
1/25/2017 2:11:09 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
DRAINAGE TRENCH FOR FUEL DOCKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOEING FUEL DOCK - TRENCH DRAiN JULY 1994 <br /> 1. Ensure the safc passage of persons around the area o(dcmolition. Conduct <br /> operations to prevcnt injury to adjacent buildings, structures, other (acilities, <br /> and persons. <br /> C. Explosives: The use of cxplosives wi!I not bc permittcd. <br /> D. Traffic: <br /> 1. Conduct demolition operations and the removal of debtis to ensure minimum <br /> interference with roads, strcets, walks, and other adjacent occupied or used <br /> facilities. <br /> 2. Do not close, block or othenvise obstcuct streets, walks or other occupied or <br /> use facilities without permission from Boeing. Providd alternate routes around <br /> closed or oEstnuted traffic ways if required by Bceing� <br /> E. Promptly repair damages caused to adjacent facilities by dcmolition operations at no <br /> cost to the Owner. <br /> PART 2 - PRODUCTS (NOT USED) <br /> PART 3 - EXECUTION <br /> 3.1 INSPECTION <br /> A. Prior to commencement of selective demolition work, inspect areas in which work <br /> will be perfom�ed. Phorograph existing conditions of structur�, sudaces, equipment, <br /> or to surrounding propetties which could be misconsttued as damage raulting from <br /> selective demolition work. File with Boeing prior to atarting work. <br /> 3.2 DEMOLITION: <br /> p, ped.�rm danolition work in a systematic manner. Use such methods as required to <br /> complete work indicated on drawings in accocdance with demolition scludule and , <br /> governing regulations. <br /> 1. Provide scrvices for effective air and water pollution controls as requited by <br /> local authorities having judsdiction. <br /> 2, Completely filt below-grade areas and voids resulting from demolition work. <br /> Provide fill consisting of approved eatth, grevd or sand, free of trash and <br /> debris, frost and froun materials, stones over 6 inch diemeter, roota or other <br /> orgenic matter. Use satiafectory soil materials and plaa as specified in <br /> Seclion 02221. <br /> 3, pavet Areas Demolition: Dreak up and remove construction including <br /> surface, base and subbase unless otherwise indicated to remain. <br /> DEMOLITION 02050 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.