My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
DRAINAGE TRENCH FOR FUEL DOCKS
>
3003 W CASINO RD DRAINAGE TRENCH FOR FUEL DOCKS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 2:11:57 PM
Creation date
1/25/2017 2:11:09 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
DRAINAGE TRENCH FOR FUEL DOCKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ROL!NG F'UGL DOCK - TRENCH DRAIN ]ULY l994 <br /> B. If unanticipaled mechanical, electrical or structural elemcn�s which wnflict with <br /> ' intended funr,tion or design arc encountered, investigate and measuro both nature end <br /> cxtent of the conflict. Submit report to Boeing in writtcn, accurate detail. Pending <br /> receipt of directive from Boeing rcarrange selective demolition schedule as necessaq� <br /> • to continue overal! job progress without delay. <br /> C. Pollution Controls: <br /> 1. Use water sprinklinv„ temporary enclosura, and other suitablc methals to , <br /> limit the amount of dust and dirt rising and scattering in the air to thc lowest <br /> ptactical level. <br /> 2. Comply with the NPDES requirements outlined in Division 1. <br /> 3. Do not use water when it may cteate hazard�us or objectionable conditions <br /> � such as ice, ilooding, and pollution. <br /> 4. Clean adjacent structures and work of dirt and debris c�used by demolition <br /> operations. <br /> 3.3 CUTTING: <br /> A. Cirt existing construction usin@ mcthods least likely tu damage elcments ta be retained <br /> or adjoining constn�ction. <br /> B. Cut through concrcte using a cutting machine auch as a carborundum saw or diamond <br /> corc drill. <br /> ;� <br /> C. Owner's Autno�iud representative shall inspect and approvc sawcut layout prior to <br /> commencing work. <br /> 3.4 WASTE MATERIALS: <br /> A: GENBRAL: <br /> 1, All demolished matetiais shall be removed from the site and disposed of by <br /> the Contractor in accordance with all federal, state, and local regulations. <br /> Dispose in aceordance with Boeing Intracompany Proceduro RH-ADD•010; <br /> Solid Waste and Sail Disposition Management. <br /> 2. If harardous or special wastes are encountered immediataly contact the <br /> Owner's Authorized Representative and Safety Respresentative as required by <br /> the$mergency Reponse procedure of Section 01050. <br /> 3.5 CLEAN-UP AND REPAIR: <br /> A. Upon completion of demolition work, remove tuols, equipment and demolished <br /> materials from site. Remove protections and leave areas clean. <br /> E. Repair demolition perfonned in excess of that rcquired• Return structures and <br /> aurfaces to remain to wndition existing prior to commencement of demolition work. , <br /> Repair adjacent construction or surfaces soiled or damaged by demolition work. <br /> END OF SECTION 02050 <br /> 02050 - 3 <br /> DEMOLITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.