Laserfiche WebLink
DOEING PUEL DOCK - TRENCH DRAIN )ULY 1994 <br /> SECTION 02724 - STORM SEWER SYSTEM <br /> PART 1 - GCNGRAL <br /> 1.1 SUMMARY: <br /> A. Reiated Documents: Drawings and general provisions of Contract, including General <br /> and Supplementary Conditions and Division 1 Specifications Sections, apply to this <br /> Section. <br /> I.2 WORK INCLUDED: <br /> The extent of storm scwer systems work is shown on the drawings and includes, but is not <br /> limited to, the following: <br /> A. Verification of location and elevation of existing utilities. <br /> B. Gravity stortn sewer pipes. <br /> C. Manholes, fromes and covers. <br /> D. Inlets, frama and gratings. <br /> E. Transition couplings or adapters, or concrete closure collars. <br /> F. Temponry flow diveraions, bypassing, and pumping of flows as required during <br /> connectiora betwan new and exiating piping. <br /> 1.3 SUBMITTALS: <br /> A. Submit manufacturcr'a product data for piping <br /> B. Test results for Gnvity Stocm Sewer Pipe Test. <br /> PART 2 - PRODUCTS <br /> 2.1 MATERIALS: <br /> A. General: Fumish ells, wyes, tas, couplings, reducera, transitions and end caps of the <br /> same type and class of material as the pipe. <br /> B. Cement-lined Ductile Iron Pipe: Centrifugally cast, ductile iron, ANSI A21.51, <br /> AWWA CI51, ament-lined and seal-coated in accordancc with ANSI 21.4, and ahall <br /> STORM SEWER SYSTEM 02724 - 1 <br />