Laserfiche WebLink
BOEING FUEL DOCK - TRENCH DRAIN IULY 1994 <br /> � during mixing, placing, and curing. <br /> I. In cold weather comply with ACI 30C. <br /> 2. !n hot weather comply with ACI 305. <br /> 3.2 CONCRETE FINISHES: <br /> A. Exposed-to-View Sutfaces: Provide a smooth finish for exposed concrete surfaces. <br /> Remove fins and projections, patch defective areas with ament grout, and rub <br /> smooth. <br /> B. Curing: Begin initial wring as soon as fra watet has disappeared from exposed ! <br /> surfaces. Where possible, kap continuously moiat for not less than 72 hours. � <br /> Continue curing by use of moisture-retaining cover or membrane-fortning curing <br /> compound. CLre formed surfaces by moist curing until fotms are removed. Provide <br /> protections as required to prevent damage to exposed concrete sudaces. <br /> END OF SECTION 03300 <br /> � �� � <br /> � <br /> .�. <br /> .XNh tl <br /> I <br /> CAST-IN-PLACE CONCRETE 03300 - 4 <br />