Laserfiche WebLink
BOEING EVERETT SECTION 34 11 10 <br /> NEW RAILSPUR TRACKWORK-GENERALRE�UIREMENTS <br /> WGRK ORDER 10-305 <br /> 13 REFERENCESTANDARnS <br /> A. Pertinent provisions of the following listed atanderda end publicetiona shall appty to the Work,ezcept <br /> as they may be modified herein, and are hereby made part of these Specifications to the extent <br /> required. <br /> 1. American Reihvay Engineering and Meintenance-al-Wey Assaietion, Manual for Railway <br /> Engineering, herein referred to as lhe AREMA Manual. <br /> 2. American RaiNaay Engineering and Meintenance-of-Way Association,Portfolio of Treckwork <br /> Plena, herein referred to ae the AREMA Portfolio. <br /> 3. BNSF Reil Company-Dealgn Guidelines lor Induslrial Treck Project-May 2011. <br /> 4. Americen Society for Testing end Malerials(ASTM) <br /> ASTM E10 Slandard Method ot Brinell Herdnesa for Metellic Materials <br /> 5. Washington Slate DepaRment of Transportation (WSDOn <br /> Stendard Spec�cations for Road, Bridges, and Municipal Conetruction(2000) <br /> 1.4 SUBMITTALS <br /> A. Submittels of these Specificetions. <br /> 1. Submittels shall include ceAificates of complience,codea and regulations of thejurisdictional <br /> aulhorilies including other submitlals as stipulated in these Specificationa. <br /> 2. Menufadurer's printed instruction for special trackwork assembly shell be furnished by the <br /> Contraclar Menu(aclurer's shop drawings and inslruction for special treckwork shall be <br /> aveilable for Boeing Const�uction Manager's review pnor lo consWction. <br /> 3. Submit lhe end-hardening procedure e�d a list ot treined or olherwise qualified personnel <br /> who will peAortn the end-hardening on the rail in lhe fisld to Boeing Construclion Manager. <br /> 4. Rail End-Hardening Submittal and Tests <br /> 5. Continuous welded rail laying records as specified in AAicle 3.07,Laying Continuous Wetded <br /> Rai; <br /> 6 Two rail thermometers. <br /> 7 Submit the type of equipment and method of operation to Boeing Construdion Manaaer lor <br /> acceptance prior to inilialion of rail gnnding. <br /> 8 In order to detertnine the acceptability of lhe installelion,lhe Contractor shall make a survey <br /> oi the track and submit a copy to Boeing Construction Manager for review. <br /> 9. Submil conslruction equipment data and loading diagrams lo Boeing Construction Manager <br /> for rewew. <br /> Permil Set 34 11 10-4 <br /> September23. 2011 <br />