Laserfiche WebLink
BOEING EVERETT SECTION 34 11 10 <br /> NEW RAIL SPUR TRACKWORK-GENERAL RE�UIREMENTS <br /> WORK ORDER 10-305 <br /> PART 4-MEASUREMENT AND PAYMENT <br /> 4.1 MEASUREMENT: The general requirements lor track co�struction will not be measured seperately <br /> for payment. <br /> 4.2 PAYMENT: The general requirements for track construdion will be pafd for ae part oi lhe Contrect <br /> unit prices for the assxialed track conatruction work. <br /> END OF SECTION <br /> Permd Set 34 11 10- 71 <br /> ir��tPinher ;3 7011 <br />