My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD RAIL SPUR SITE 45-YD 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
RAIL SPUR SITE 45-YD
>
3003 W CASINO RD RAIL SPUR SITE 45-YD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:56:40 PM
Creation date
1/25/2017 3:07:20 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
RAIL SPUR SITE 45-YD
Notes
RAIL SPUR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOEING EVERETT SECTION 34 11 11 <br /> NEW RAIL SPUR BALLASTED TRACK CONSTRUCTION <br /> WORK ORDER 10-305 <br /> PART 1 -GENERAL <br /> 11 DESCRIPTION <br /> A. This Section includes specificalions(or the conslruction oi ballasted lrack. <br /> 8 The conslruction oi ballasted track shall include <br /> 1 Hauling oi construction materials <br /> 2. Construction of ballasted track. <br /> a Removal and replacemenl oi portion ot lead track to accommodate placement of new <br /> No 9 turnout lor re•allgnment ot passing track <br /> b Removal and replacemenl oi portion oi passing track to accommodete placemenl o( <br /> new turnoul for Rail Spur 1 and Rail Spur 2. <br /> The above construction is encompassing and includes all pertinent trackwork related items <br /> associated with lrack construction such as the weld joints, rail cutting and stress adjustment, <br /> tamping, surtacing,lining and gauging and olher operations necessary to construcl an acceptable <br /> completed track slructure, <br /> � Z REFERENCESTANDARDS <br /> A American Railway Engineering and Maintenance-ol-Way Association,AREMA,Manual lor Railway <br /> Engineering <br /> B. BNSF Railway Company-Design Guidelines for Industrial Track Projects. 2011 <br /> 13 SUBMITTALS <br /> A. The tollowing submittals shall be made by the Contractor <br /> 1 Detailed descriplions oi construction method Work Plan 90 days prior to commencing <br /> trackwork required for the work specified in this Sedion. <br /> 2 Survey of the track tor acceptance. <br /> � 4 OUALITY ASSURANCE <br /> A To determine the acceptabllity ol the installation,the Conlractor shall make a survey of lhe track and <br /> provide the Boeing Construchon Manager with a copy for review Deviations from the Drawings that <br /> exceed tolerances specified in Sec6on 34 11 10,Track Construchon,General Reqwrements,shall <br /> be corrected by the Contractor at no additional cosl to Owner <br /> Permd Set 34 t t t t - 1 <br /> September 2J. 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.