Laserfiche WebLink
BOEING EVERETT SECTION 34 11 11 <br /> NEW RAIL SPUR BALLASTED TRACK CONSTRUCTION <br /> WORK ORDER 10-305 <br /> PART 1 -GENERAL <br /> 11 DESCRIPTION <br /> A. This Section includes specificalions(or the conslruction oi ballasted lrack. <br /> 8 The conslruction oi ballasted track shall include <br /> 1 Hauling oi construction materials <br /> 2. Construction of ballasted track. <br /> a Removal and replacemenl oi portion ot lead track to accommodate placement of new <br /> No 9 turnout lor re•allgnment ot passing track <br /> b Removal and replacemenl oi portion oi passing track to accommodete placemenl o( <br /> new turnoul for Rail Spur 1 and Rail Spur 2. <br /> The above construction is encompassing and includes all pertinent trackwork related items <br /> associated with lrack construction such as the weld joints, rail cutting and stress adjustment, <br /> tamping, surtacing,lining and gauging and olher operations necessary to construcl an acceptable <br /> completed track slructure, <br /> � Z REFERENCESTANDARDS <br /> A American Railway Engineering and Maintenance-ol-Way Association,AREMA,Manual lor Railway <br /> Engineering <br /> B. BNSF Railway Company-Design Guidelines for Industrial Track Projects. 2011 <br /> 13 SUBMITTALS <br /> A. The tollowing submittals shall be made by the Contractor <br /> 1 Detailed descriplions oi construction method Work Plan 90 days prior to commencing <br /> trackwork required for the work specified in this Sedion. <br /> 2 Survey of the track tor acceptance. <br /> � 4 OUALITY ASSURANCE <br /> A To determine the acceptabllity ol the installation,the Conlractor shall make a survey of lhe track and <br /> provide the Boeing Construchon Manager with a copy for review Deviations from the Drawings that <br /> exceed tolerances specified in Sec6on 34 11 10,Track Construchon,General Reqwrements,shall <br /> be corrected by the Contractor at no additional cosl to Owner <br /> Permd Set 34 t t t t - 1 <br /> September 2J. 2011 <br />