My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD RAIL SPUR SITE 45-YD 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
RAIL SPUR SITE 45-YD
>
3003 W CASINO RD RAIL SPUR SITE 45-YD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:56:40 PM
Creation date
1/25/2017 3:07:20 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
RAIL SPUR SITE 45-YD
Notes
RAIL SPUR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Jane Zimmerman <br /> Sent: Wednesday, August 24, 2011 12:27 PM <br /> To: Heather Kibbey; Kirk Brooks <br /> Cc: ]im Miller; Benyam Stephanos <br /> Subject: RE: Bceing plans in for review <br /> Well, they have a symhol "�", on the plans, which is �or this current revision, that ii��ludes a lot o(catdi basin <br /> replacements...?? 6ut Kirk's response does help me understand the plans a bit better, hecause there's a lot of work <br /> labeled "new" that isn't part of the current ievision. I must have reviewed and approved U�at work before,but to be <br /> honest, I was probably (eeling too apathetic to even raise the issue. I apologize if I overlooked this before and Boeing is <br /> mn(used by �he dianF,e of dueclion. I was rloin�, the hest I coulcl at lhe lirnr, Lut I'm capable o( better now. <br /> Thankyou. <br /> lane <br /> From: Heather Kibbey <br /> Sent: Wednesday, Augus[ 24, 2011 9:55 AM <br /> To: Kirk Brooks; Jane Zimmerman <br /> Ce: ]im Miller, Benyam Stephanos <br /> Subject: RE: Boeing plans in for review <br /> �Nell, perhaps a heads iq� for them ihen, ihat we will ncod ihe ctonnwat�r in(o as thry progiess, so ihi�y shoulA start <br /> �;etting it together now, especially i(they arc unsurr of paris of th�ir syst�m, and may n�ed ro do dyr trstin�;, etc. Jan�•, <br /> is thrre more ihan what Kirk indicates in the plans' <br /> From: Kirk Brooks <br /> Sent: Wednes�ay, August 24, 2011 9:36 AM <br /> To: Heather Kibbey; ]ane Zimmerman <br /> Ce: Jim Miller; Benyam Stephanos <br /> Subject: RE: Bceing plans in for revicw <br /> Here's a notr (rom �� short-timer to you�an ta6r iI fur valu�� or jutit q;norr. <br /> The 6oeing plans that are in for review are for the Toe-path prejcct that was alr�ady�approved, permitted and <br /> c onstruded. Unfortunately, [he material they used lor Ihe paving did not work for the heavy planes. This perrnit was <br /> supposed tn be for resurfacine, bid I personally have not loeked thiough the plans. fioeing has a larger project o the <br /> (ront burner which may be a more appropriate venue for�he requesL Kirk <br /> hnh L3rootis <br /> Cdy ol Evr,rett 8uilding 011icial <br /> Phone 425-257-8815 <br /> F�w 425-257-88,57 <br /> From: Heather Kibbey <br /> Sent: Wcdncsday, August 24, 2011 6:52 AM <br /> z <br />
The URL can be used to link to this page
Your browser does not support the video tag.