LEASE CRUTCHER LEWIS <br />TCO REQUIREMENT / COORDINATION MEETING <br />MAY 27, 1992 <br />PAGE TWO <br />The following requirements were discussed: <br />A. ADT FIRE ALARM SYSTEM <br />Needed by 6/22/92: Wiring to 6 risers, PIvs <br />Telephone connections. <br />inst <br />ADT terminations, 6/22rthruser 6/29/92alled at <br />ADT acceptance test by Boeing Fire Department, <br />B. ELECTRICAL SYSTEM <br />& OSYs. <br />CS&P. <br />6/29 - 6/30/92. <br />6/05/92: Deliver generator <br />6/05 - 6/19/92: Install generator <br />6/15 - 6/19/92: Mechanical to install fuel and exhaust <br />Piping. <br />6/29/92: Test emergency generator and lighting. <br />C. ELEVATORS <br />6/22/92: 24 hour telephone lines. <br />6/22/92: Wiring complete to recall panels. <br />6/08/92: Complete cab panel in elevator #1. <br />6/09 - 6/10/92: Complete drywall above shaft. <br />6/11 - 6/12/92: Install sprinkler head and smoke detector. <br />6/22 - 6/26/92: Install hardware on elevator machine room <br />doors. <br />6/22/92: Complete dedicated 20 amp circuit. <br />6/12/92: Complete motor starters/shunt trips. <br />6/19/92: Complete fire recall contacts and wiring. <br />6/22 - 6/26/92: Certify elevators. <br />D. HONEYWELL CONTROLS <br />1. It was confirmed that there are no connections between <br />Honeywell's smoke detectors and the ADT system. <br />