LEASE CRUTCHER LEWIS <br />-' a I C I O P 9 <br />TCO REQUIREMENT / COORDINATION MEETING <br />MAY 27, 1992 <br />PAGE THREE <br />HONEYWELL CONTROLS (continued) <br />2. Honeywell plans to test the 3 CPUs separately with each <br />area tested, 1 week apart. <br />3. Honeywell needs wiring to the 3 CPUs completed by 6/10, <br />6/17 and 6/24/92, with start up and check out to take one <br />week each. <br />4. Evergreen can not have first CPU wired before 6/19/92, <br />unless overtime is approved. <br />5. If Honeywell system is not complete by 7/01/92, a fully <br />automatic temperature control will not be possible. <br />Units can be controlled manually. <br />6. Mechanical sub will need 3 weeks for balancing equipment. <br />Fire hose cabinets and extinguishers will be installed by 6/29/92. <br />Tim Tyler / City of Everett confirmed by telephone that the <br />following final inspections are required: <br />1. Building inspection - Ken Jackson <br />2. Plumbing and Mechanical - Bryan Waugh <br />3. Electrical - Mike Schwartz <br />4. Site Utilities - Carroll Tollefson <br />