Laserfiche WebLink
COLD WATER CROSSTIE <br /> EVERETT SITE, SOUTH COMPLEX <br /> JOH NUMBER 920553 . <br /> �_OBJECTIVE <br /> Add an 8-inch domestic water connection from thr_ end of the <br /> 12-inch main ofE Airport Road to the existing 8�-inch supply <br /> line for Buildings 45-03 and 45-06. This crosstae will " <br /> become the primary supply line for those two buil3ings and <br /> for the Field Steam Plant, Building 45-07, now ��nder � <br /> construction. It will also be a secondary sourc�a of City <br /> Water to the rest of the South Complex. At the ,�resent time, <br /> the only source is a lU-inch line across the freeway bridge <br /> from the North Complex. _ . . . <br /> .. <br /> B. SCOPE OF WORK " <br /> Refer to Technical Specification P-104,B <br /> 1. Install approximately.-35o lineal feet of 8-inch, cement- <br /> lined, ductile iron pipeline around the South side of .the <br /> 45-06 Building. - <br /> 2. Pressure-test the new line to 100 p:;iq, <br /> 3. Connect the new line to the existing 12-inch valve •at the <br /> end of the r�ew supply line located near the southeast <br /> corner of Bldg. 45-06. � <br /> 4. DisinYect and flush the neW �ine according to City of <br /> Everett domestic water supply requirements. <br /> 5. Connect the new line into a valved tee iriserted into the <br /> existing e-inch supply line for Bldq. 45-03 at a point <br /> west of Rldg. 45-06. <br /> G. DRAWING REFERENCE <br /> 45-04 Sheet C032 REV.E <br /> RECOMMENDED CONTRACTORS <br /> Clemens 6 Jaurez <br /> Deeny Construction <br /> Lumpkin Construction � <br /> � IS � �'1 lS I I I I <br /> I II I <br /> Prepared by: C. F. Heilbronner i�� C `� 1�? ) L-J <br /> T-6153 342-5213 y <br /> Navember 17, 1993 (.�1 ( OF EVERETT <br /> kild�;. P�rmit Coun�er <br />