Laserfiche WebLink
In� 1l <br /> [bb Landles, Planning Department � _ ,�y , <br /> �� ,��_ � in ,�f�1; �. �i �c� �a-��. <br /> I Public Works Department ` �� �DAL, I <br /> ��.- <br /> i May 15, 1980 I <br /> S.E.P.A. Checklist Review A80-36 � <br /> , Proponent: Rodney E. Hoover and Assocfates � <br /> I � <br /> ' PROPOSALc <br /> I To construct a 120-unit multlple Samily residential complex on the north I <br /> � side of Casino Road, west of Mukllteo school matntenance fadllty. <br /> , <br /> � RECOMMENDATIONS: I <br /> � It is the recommendatton of the Public Works Department that iswance � <br /> I of a Negative Declaration be subject to the following: <br /> � 1. A detailed draw(ng shall be submitted to the Public Works Department , <br /> , showing parking layout, landscaping, driveways, ut(litles, storm <br /> drainage, and all required improvements to the public rlght-of- ' <br /> way. Public Works Department approval of these drewings Is requ3red � <br /> betore any pennits are issued. All improvements shall be completed ' <br /> ! before the Occupancy Permit Is Iswed. ' <br /> i As-builts, easement, and a one year Warrantee Bond in the amount ' <br /> � of 10%of the cost of constructlon oi th• public water system are <br /> requlred wlthfn !0 working days of obtaining public water rnnnection. � <br /> 2. City streets are to be kept clear of dlrt and debr(s during construction. , <br /> � 3. Durfng rnnstruction, all truck traific to and from the s[te wlthin <br /> � the Clty of Everett shall be on arterial streets unless otherwise i <br /> ! approved by the Publlc Works Department. , <br /> 4. Addltional building iniormatlon Is required to deter�ine the improvements, � <br /> , if any, to the exlsUng water system that wlll be requlred to provide I <br /> i adequate fire protectlon to thls site. � <br /> S. The invert of the sewer maln at 603 W. Caslno Road ls at an elevatlon <br /> of 680 feet, Everett datum, which should allow grav3ty service <br /> for the entire slta If pumping !s necessary, sewage shall be pumped <br /> to an on-site manhole and then gravlty fed Into the city's sewer <br /> system. I <br /> � � 6. Participatlon in the program to fund the south end sanitary sewer i <br /> lnterceptor Is required. ; <br /> 7. Stormwater runoff shall be conveyed to the existing drainaqe swale ' <br /> ! that flows easterly along the southern edge of SR526. On-site <br /> detention is requlred, a temporary erosion control plan approved <br /> prior to commencing any construction activities, reseeding of exposed <br /> soils wlthin 30 days of constructfon completton, and a Washington <br /> State permit for discharging onto the Department of Transportation's � <br /> drainage course are al! required as part i�f the dralnage plan. <br /> 8. Compliance with Caslno Road Ordinance 556-78 Is requlred. <br /> 9. Awkward parking configuration !n northeast comer is not acceptable <br /> for meeting cx�-site parking requlrements, but may be used for <br /> storage or overflowparking. <br /> Iniormation For The Develoaers ' <br /> 1. A fire hydrent is required within 2U0 feet ot al! buildings. <br /> 2. Developer is encouraged to work with city, owners and englneers of adjoining <br /> property on the east to develop a single drlveway for their mutua! benefit. <br />