Laserfiche WebLink
f ' #80-36 <br /> "� FINAL DECLARATION OP NON-SIGNIF'ICANCE <br /> . <br /> Desc�iPtio^ of P�°p°=a1 <br /> 4he proposed action is the issuanc� of building and grading permits to allow the con- <br /> la dCtiThe followingnfactorsiwereiconsideredtand the listed requiremencsYwereZplaced of ' <br /> our review of an Environmental Checklist for 1 <br /> in response to comments submitted d�ring I <br /> this proposal: <br /> 1, The site is zoned R-3, Multiple-Family I.ow-Density Residential ZoneWi�hialderuld � <br /> allow this use. The gieeevergreens�(toVremain)�.d A vacantrresidence and storage � <br /> saplings and a few larg nded area exists on <br /> shack exist on the northern portion of the site dnd a large po <br /> the eastern portion. The site aliuts S.R. 526 t:o the north, Casino Road to the � <br /> Standarddstreet�improvementscdofnoticurrentlyiexistfalong Casino Rd.tfrontagest. <br /> 2, The project includes a pool, tennis court and recreation building g�=uctures.it <br /> will contain a fireplace. The buildings are two and a half story the complex. <br /> 3, Access is proposed via Casino Road and a looping driveway surrounding <br /> The developer is encouraqed to work with city, owners and englneers of adjoining <br /> property on the east to develop a single driveway for their mutual benefit. Stan- <br /> dard strre�et�dibYrp�lictWorkscDepartment arehrequiredino Road,ordinance (R556-78) <br /> and app � <br /> 4. 182 parking spaces arP proposed, most of them covered, including 60 garaqes and <br /> 92 carports. Awkward parkinq configuration in Tequirement ofQ180 spacesitbutsmay <br /> the on-site parking � <br /> not acceptable for meeting I <br /> be used for atorage or overflow parking. { <br /> ed in conformance with the City's drainage ordinance. � <br /> 5. Drainaqe shall be deaiqn • � <br /> Stormwater runoff shall be conveyed to the existing drainage swale that flows i <br /> easterly 8erosion contrclrplanqapnrovedsprioroto9commencingianyiconstructiona � <br /> temporary <br /> ectivities, reseeding of expo=ed soils within ontoathe DepartmenttofnTransportan, i <br /> • and a Washington State permit for airedaasipart of the drainage plan. I <br /> tion's drainage course are all requ <br /> 6. As-builts, easement, and a one year Warrantee Bond in the amount of 10� of the cost I <br /> information is required to <br /> of constructlon of the public water system are required within 10 working days of � <br /> to the existinq water system that are required ( <br /> obtaininq public water connection. Additional build ng <br /> determine the improvements, if any, =oved by the Fire Marehall. <br /> siteranddfourefireehydrantsoaretrequiredhat locatio s�app Water mains through t e <br /> 7, Participation in the program to fund t.he south end sanitary sewer interceptor is <br /> required. Design of sewer system must: Ue approved by Public Works prior to <br /> issuance of permitg• arkin <br /> 8. A detailed drawing ghdriveways,mutilitiesthstorm1drainage,Dandrallnrequired9lmprove9 <br /> layout, landscaping, public l4orks Department approval of these drawings <br /> ments to the rublic right-of-way. <br /> is required before any p��its are isisued. All improvements shall be completed bc ore <br /> the Occupancy Permit is issued. <br />