My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 CEDAR ST 2018-01-02 MF Import
>
Address Records
>
CEDAR ST
>
3200
>
3200 CEDAR ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 1:20:26 PM
Creation date
1/25/2017 11:03:17 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
3200
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRYANT, BUTTERFIELD & FRETS <br />TELEPHONE 252-3304 717 MMICAL-DENTAL BUILDING • EVERETT, WASHINGTON 93201 ati' <br />INSPECTION REPORT <br />Pacific Avenue at CedarrSiree_ c�ti kw <br />Job Name Support Center Facility Location Everett, Washington <br />Owner rity of Everett Contractor 000litan Construction Company <br />Person contacted Wilbur Gardner and Roger Sheratin Date September 20, 1971 <br />On site: 8:35 a.m.; off site: 9:35 a.m. <br />580, clear <br />PROGRESS STAGE <br />Concrete footings placed along east wall from Lines 1 through 9, along south wall from F to A and west <br />wall toI+- 10'. <br />Excavation completed and forms being placed along lines 2+ I and 5; footing bottoms appeared <br />acceptable except for 2 places in Line 2 + 11' where debris (broken fire brick, wood, and steel <br />scraps) were present. <br />Wilbur was requested to remove the debris to firm soil (approximately 6" deep) prior to placing <br />concrete. <br />Rough grading of southeast area (covered parking buildings) approximately 95% complete. <br />NOTES <br />Minor grade adjustments in the covered parking building area were discussed and established. <br />Wilbur is understandably eager to start the layout and construction of the foundation fol the steel <br />buildings. <br />An examination and discussion of the incomplete data submitted to date by the supplier resulted in a <br />mutual agreement that the contractor would make a detailed check of the material submitted, <br />mark up submittal sets showing any required adjustments and corrections as well as major dimensional <br />deviations from the information shovn on the contract drawings and submit them to the architect for <br />review and approval. <br />Copies to <br />Contractor <br />Filp <br />Owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.