Laserfiche WebLink
DAILY REPORT <br />doh. No. <br />Client: Cit of Everett Buildin De artment <br />R.,on S.y..... No. <br />2 <br />vere , as ng on <br />D.r. <br />20 1 <br />Dry �� "••� <br />Mon <br />Technialon <br />r'D <br />HRS Ch.rp.d <br />2 <br />A niaenb <br />HRS Ch.rp.d <br />Pro ect: Support Center <br />1. Reinforcing Inspection: <br />Inspected placement of reinforcinc., steel <br />from row "A" to "F" steel and <br />forms were placed <br />in accordance with plans and specifications, <br />2. Concrete In ection: <br />Observed placement of 10 ards of concrete in the above iob <br />areas. 3 cylinders and slump were taken <br />for control refer t <br />cc,icre e test reportn <br />acrordrincp <br />with plans and specifications. <br />3. Weather: Clear - 680 F. <br />INDUSTRIAL TESTING. INC. <br />wl f f, <br />B � <br />. <br />Thomas C. Nelsen <br />Assistant General Manager <br />ur—Evf#ffl�— <br />ln,pprtinn Dept, <br />Distribution: <br />y o ve—r—eTr Bullding Department <br />2 Br ante Butterfield Frets & Associates <br />Architects <br />1 Kase Vanden Ende, Structural Engineer <br />1 Metropolitan Construction Company <br />File <br />/i o;i - <br />INDUSTRIAL TWINo, Inc. <br />