My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3318 CEDAR ST 2016-01-01 MF Import
>
Address Records
>
CEDAR ST
>
3318
>
3318 CEDAR ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 11:41:18 PM
Creation date
1/25/2017 11:40:46 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
3318
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Building P.O.Box 1065 Everett,WA 98206-1085 <br /> � B R O C K W AY 2823 Rockefeiler Avenue EvereC.WA 98201 <br /> . �. � (425)252�6848 Everctl <br /> ARCHITECTURE & PLANNING ToNFree1-868J77-l41� <br />� (425)259�a�N742 FAX <br /> EMAIL brocatch�gte.net <br /> City of Everett Pubiic Works Department August 9, 2004 <br /> Building Department <br /> 3200 Cedar Street <br /> Everett, WA. 98201 <br /> Re; Plan Review Response Letter for the 3318 Cedar Street, Plan Check No. <br /> 60407-003. For the Patrick building % Patrick Ventures. <br /> Attn: Steve Miller— Associate Engineer, Plan Review <br /> Kirk Brooks - Associate Engineer, Public Works <br /> The following is a point by point response to the draft Plan Review letter by Steve <br /> Miller to David Patrick dated August 2,2004, and the comments and Site Plan <br /> mark-up per Kirk Brooks and Paul McKee during their on-site meeting with Bill <br /> Brockway on July 26,2004. <br /> (A) Regarding the on-site meeting on July 26"' and conducted by Kfrk <br /> Brooks, with Paul Mckee and Bill Brockway present. <br /> 1. The Site plan and data, both on Sheet A-1 of 5 have been revised as follows: <br /> a. Standard City of Everett Detail numbers have been referenced for the curb <br /> cuts, walks, and catch basin. <br /> b. A new 6" sanitary/storm sewer line has been added, with downspout <br /> leader and clean-out locations shown. <br /> c. Paving specification note has been added. <br /> d. The electrical line disposition (at the power pole) to the house and new <br /> warehouse has been clarified with a note on the drawing. In addition the <br /> Ovrner/developer intends to install "wall-pack" exterior lightinglyard lights <br /> at both the west and east faces of the new building. <br /> 2. A Landscape Pfan (sheet A-5 of 5) has been added per Planning/Public <br /> Works Departments requirements. Please note that a landscape irngation <br /> system is not proposed at this time. Refer to the note below and the Project <br /> Descriptian on Sheet A-5 of 5. <br /> �'Ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.