Laserfiche WebLink
( C. . . . . <br /> 2. If the lots are developed with a non-residential commercial stnicture or a residential <br /> structure of five or more units then fuli standard half street improvements are required to <br /> Chestnut Street, including but not Iimfted to curb, gutter, sidewalks, street widening and <br /> drafnage control per City Design Standards. <br /> 3. The proposal must comply with the Small Lot Development standards as contained in <br /> Section 7 of the City of Everett Zoning Code. <br /> 4. This project must comply with the current City of Everett Building Code. A buflding permit <br /> is required for this project. <br /> This is an adminfstraHve decision that Is appealable to the City's Land Use Hearing Examiner. An <br /> appeal must be filed with the City within 14 days of the date of this notice. If you have questions <br /> regarding this proposal or if you wish to flle an appeal, plassa contact Becky Fauver,City of <br /> Everelt Planning Department, at(42S) 267-7281. <br /> Date: August 3, 2004 I <br /> � • '`„[i�S�_ <br /> �, ,,< ly� <br /> Allan Giffen, irector _j� // <br /> Planning and Community Development Department <br /> S:�BFauvehSPUl04-007 14u Cheslnut.doc �� <br /> N/ <br />