My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021 CHESTNUT ST 2016-01-01 MF Import
>
Address Records
>
CHESTNUT ST
>
2021
>
2021 CHESTNUT ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 1:43:24 AM
Creation date
1/26/2017 1:43:04 AM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
2021
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lrerracon <br /> July 24, 1997 pROJECTTEAM <br /> 8r 10-1S/m Awmn NE <br /> Rednab.WUNrqton 98052 <br /> (Y06�EE1d000 F�i(208)BGItOSO <br /> Bechtel Corporation <br /> 8140 Old Highway Southeast <br /> Tumwater, Washington 98501 <br /> Attention: Mr. Jim Collins <br /> Re: Geotechnieal Engfneering Report <br /> Proposed U.S. West Tower Site SEA•11bD <br /> 3200 20th Street <br /> Everett, Waahtnpton <br /> GeoEngineercl ProJect No. 6408-001-01, Task 16 <br /> Terracon Project team has compieted geotechni,:al engineering exploration for the proposed US <br /> West Tower Site SEA-115D to be iocated at 3200 20th SLeet in Everett, Washfngton. A Sketch <br /> showing the tower focation was provided by Mr.Jim Collins of Bechtel,a copy of which is attached <br /> as Figure 1. This study was perfortned in general accordance with the scope of work (Exhibit A) <br /> contained in the Terracon ProJect Team contract with Bechtel dated September 24, 1996. The <br /> purpose nf these services is to provide geotechnfcal engineering recommendations for design of <br /> foundations and other earth comected phases of the project. <br /> Propoaed Construction: As currently planned, construction on the sita will include a monopole <br /> cellular transmission tower and ancillary support equipment. The proposed monopole tower will <br /> be approximately 150 feet in height and will be supported on a drilled shaft foundadon system. <br /> Maximum vertical loading at the base of the monopole and maximum overtuming moment are not <br /> available at this time. We exped that further consultaUon may be necessary once the loads have <br /> been detertnined. <br /> Scope of Servicea: The scope of the services perfortned for this project included e subsurface <br /> exploration program, laboratory testing and engineering analyses. One test boring was drilled on <br /> the site at the location of the proposed monopole tower. Selected soil samples were tested for the <br /> following engineering properties: <br /> • Water content <br /> • Dry Density <br /> • Compression <br /> • Expansion <br /> • pH <br /> • Resistivity <br /> • Water soluble sulfate content <br /> GEOTECMNICAL,ENVIROHMENTAL ANU MATERULS ENOINEENa OUALT'ENOINEENMO SINCE 1Yl6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.