Laserfiche WebLink
(- � - <br /> 2. The Applicant shall provide a landscape plan that satisfies Category B <br /> Landscaping requirements as set forth in the Everett Zoning Code. This <br /> plen is to be submitted prior to issuance of Building Permits. The <br /> landscaping must be installed within 90 days of the installation of the <br /> monopole. <br /> 3. The Applicant shall remove the e?cisting tower within 90 days after the <br /> (nstallation of the monopole. <br /> Done and dated this 10th day of Aprii, 1998. <br /> "1• �,l�4ti� <br /> Jam M. Driscoll <br /> Hearing Examiner <br /> 11 <br />