Laserfiche WebLink
REPAIR SF IFICATIONS AND LZST OP WG . TO SE BID <br /> ' Page 2 of 5 <br /> Address: 2208 Chestnut <br /> 1. Front Porch Construct new gable end roof over front <br /> porch as shown in drawinqe. Roof framinq : 2 x 6's , <br /> roof slope match house roof slope, bolt frame to <br /> houae. install beaded soffit board over rafters and <br /> 1/2" CDX plywood over beaded boacd. Roofing nails : not <br /> to penetrate beaded board. Constcuct and inatall <br /> brackets as shown to match existin�3 roof brackets, <br /> bolted to house. All trim as shown. install wall to <br /> roof step flashing. <br /> Inatall forma 6" out on each side of ateps, 6" out from <br /> bottom step, and out from top step to leave 10" tread on <br /> bottom step. Remove existing sill on front daor and <br /> replace with presaure treated material. Pour concrete <br /> to fill forms and raise landing approximately 1-1/2" and <br /> firat step 3/4". Caulk between new sill and new = <br /> concrete cap. Repair siding at houae to fit new porch � <br /> dimenaiona. Cap : brush finish. m <br /> s �JS,� .. <br /> ..... <br /> . � � <br /> 2. �Roo�finy, Tear off existinq roofing complete to skip <br /> s e�i a ing. Replace atarter board. Tear down chimney to o m <br /> below roof line. Install 3/8" CDX plywood over entire m� <br /> roof. Install 15# asphalt impregnated felt over o� <br /> plywood. inatall anodized or galvanized metal drip edge <br /> on all rakes and eaves. install continuous metal ridge m� <br /> vent at ridge of main house roof. Inatall 220# three „ <br /> tab fiberglass comgosition roofing on house and new _ Q= <br /> front porch roof, in accordance with manufactucer 's <br /> inatallation instructions. Registec date of application �N <br /> with manufacturer and provide ' warranty to owner. � <br /> Preserve exiating gutters during roofing wock. Clean �� <br /> out qutters and downspouts when finished. � <br /> , g 13 CI S a-o o., <br /> � <br /> or <br /> �m <br /> 3. Exterior Sidin Repair rake brackets. Outside edge �N <br /> o rake : rought level with reat of coof. Existing �� <br /> brackets : renailed' together as neceasary and bolted to , a <br /> solid backinq in siding to maintain rake edge level. A <br /> -� <br /> Power wash existing siding complete. Scrape all loose Z <br /> • and peeling paint from siding and trim. Caulk all gape <br /> between siding and trim with paintable acrylic caulk. M <br /> Prime all new and bare wood with exterior oil base � <br /> primer. Paint entire house siding and trim two coats, o <br /> two colors, owner choice of coloca, oil based exterior -, <br /> paint. r", <br /> s � �"�' �S � <br /> 4. Back Porch Ownec will tear out existing ahelves and <br /> counters�n back pocch. Jack up west end of porch and <br /> cemove exiating beam. install new continuoue block <br /> foundation on new conccete footings on three sidea of <br /> back pocch addition to code. Leave floor level as <br /> originally constructed. <br /> Paint floor of pocch and back steps with two coats oil <br /> base deck paint, owner 's choice of color. Install <br /> presaure treated T1-11 plywood skirting on solid backing <br /> at perimeter of back stoop. <br />