Laserfiche WebLink
i <br /> � <br /> • REPAIR SF .IFZCATIONS AND LIST OP WG__. TO HE BID <br /> � . i <br /> ' Page 3 of 5 <br /> Address: 2208 Chestnut <br /> Construct new shelves and counters on same walls as <br /> existing. Counter : 3/4" A.0 plywood and shelves : <br /> 3/4" particle board. Frame . 2 x 4 's, adequately <br /> supported and braced to support owner's rock cutting and <br /> poliahing equipment. Consult with Aouaing improvement <br /> Advisor on specifics of deaign and conetruction of <br /> ahelves and counters. <br /> $ -7yy °� <br /> 5. Walla s Ceilin e Install new 2 x 6 ceiling joist <br /> ram n9 eneath existing ceiling in living room and both <br /> bedrooms. install 16" O.C. and secure ledqers to wall <br /> • studa, joiata to ledgers with metal hangera. Install <br /> 1/2" gypeum. wallboard over new joists. install 3/8" o <br /> . gypaum wallboard over existing walls in both bedrooma <br /> and 1/2" gypsum wallboard over walls in living room, m <br /> owner will gut existing paneling. " <br /> • ..�. <br /> Tape and apackle new walls and ceilings foc smooth wall �' " <br /> . finiah. Seal new walls with primer and paint two coata v+m <br /> flat latex, ownec chaice of colora. � z m o <br /> � �y ?0, . �� <br /> 6. Doors 6 Wi��dowa Install new solid core fluah wood m� <br /> exter or door at door to attic including all necessary ,o= <br /> framinq. Door painted, ownec choice of color and ' � � <br /> include weatheratripping on all aidea, new passage � _ <br /> .,... <br /> latchset dooc hardware. ��+ <br /> � <br /> Install new insulated raw unit in window behind o A <br /> paneling <br /> on east end of south wall of livin9 room. Stop in ready =� <br /> -to paint with rest of room. �^�, <br /> � � _1 �J. � c�-�m <br /> C N <br /> 3 v� <br /> m <br /> 7. Floors Aemove any exiatinq floor covecinga in the �� <br /> k�tchen, living room. and both bedrooma. Install new ' a <br /> carpet in each 'room over 3/8" rebond type pad. Ose 7O <br /> manufacturer's� approved tack stripa and edge baca. _ <br /> Material allowance for carpet s S16 per aquare yard = <br /> retail. Owner will tear out and diepose of hearth in � <br /> southeast corner of living room before carpet � <br /> installation. Owner choice of carpe�-s�yie-and-ce�ot.—--- --- '^ <br /> _ <br /> $ � cSp o <br /> � <br /> n <br /> m <br /> 8. inaulation Insulate joist cavities in crawl space to <br /> R-l�th foil or kraft backed flberglasa batts. Secure <br /> into each cavity with furring stripa 18" O.C. , <br /> perpendicular to joista. Install 6 mil polyetheline <br /> vapor barcier over qround in crawl space. Replace <br /> misaing acreen venta. <br /> Install blown-in celluloaic inaulation to fill all <br /> exterior walls stud cavities from outsibe. Drill <br /> minimum two holes in each full length cavity, one hole <br /> above and/or below doors and windows. Celluloae <br /> insulation : Class 1. Plug holes with plastic plugs. <br />