Laserfiche WebLink
� <br /> � <br /> FINAL DECL?,RATION OF NON-SIGNIFICANGE J <br /> � SEPA // 81-48 <br /> I <br /> This Final Dedaration of Nonsignificance shall expire one year from � <br /> date of issuance unless a completed building permit application has � <br /> been submitted within that time. A request for d one year extension of � <br /> this Final Declaration of Nonsignificance may be made to the Planning <br /> Director rior to the ex iration date. <br /> 12. On-site drainage retention will not be requried. <br /> I <br /> 13. A fire hydrant is required within 200 driving feet, but not closer than 50 feet of �he <br /> structure. � <br /> 14. Landscaping must be provided in compliance with zoning code requirements 3nd <br /> must be shown on the final site plan. <br /> INFORMATION FOR THE APPLICANT: , <br /> In addition to improving the area across the frontage of the proposed additlon, new <br /> concrete sidewalk will also be requfred from the existing south s[de of the asphalt <br /> area in front of the existing warehouse around onto Pacific Ave. to join with the <br /> existing sidewalk at the southwest corner of the total site. <br /> Perforrriance guarantees, as required, will be by an approved method as determined � <br /> by the City. <br /> Proponent . <br /> David Kehle/7ack Curran � <br /> 1932 Flrst /I302 <br /> SEatUe, WA 98101 <br /> Location of Proposal <br /> SE corner of Chestnut and Dakota Streets (north of Pacific, South of Hewitt) <br /> Lead Attency: City of Everett Planning Department Receipt No. <br /> Contact Person: Bob Landles Phone: 239-8731 File No. <br /> This proposal has been determined not to have a signlficant adverse impact on the environment. <br /> An Environmental Impact Statement is not required under I2CW 43.21�.030(2)(c). This decision <br /> was made after review by the lead agency of a completed enviranmeiital checklist and other <br /> information on file with the lead agency. This Declaration of Non-Significe�nce is specifically <br /> condltioneQ on compliance with the conditions attached hereto which are incorporated by reference <br /> as if fully set forth herein. <br /> I <br /> A fifteen day review period has elapsed for this project and no adverse comments were received. <br /> Responsihle Officiali Dennis Derickson <br /> litle: Planning Director , � <br /> Date: August 20, L l <br /> . � <br /> Signature: �� <br /> NOTE: This final Dedaration of Non-Significance may be withdrawn in the event of significant <br /> chauges in this proposal, or failure to comply with the conditions upon which this Declaration <br /> of Non-Signiflcance is predicated. <br /> � <br /> � 1 <br /> I <br />