Laserfiche WebLink
16) This secondary member will be clarified on Sht. #2S500 for the next <br /> revision. <br /> 17 - Sh.�t� 2S500, 2S501, 3S500, 3S501, 4S500, 5S500 and 5S501. The sheets • <br /> nferenced for the stairs/elevatora near R6 and R9 appear to be Incorrect. <br /> Al�o, It sesm� the wind columns and struts on Line R between Lines 8 and <br /> 7 ahould ba shown for cl�rity. <br /> 17) The Stair references will be corrected on the next revision. Showing wind <br /> columns and struts on the floor framing plans would add un-needed <br /> clutter to the drawings. The wind columns and struts are clearly shown <br /> on the building elevation drawings. <br /> 18 - Sheet SS500. It appears a Ilnk beam bracing dlagonsl fs miasing for the <br /> Iink beam on Line R at Une 10.25. <br /> 18) This is a drafting error and will be corrected for the next revision. <br /> 19 - ShNt bS502. In ths typlcal houeekeeping pad detall the pad should be <br /> dowel�d to the tloor slab for positive seismic shear transfer. <br /> 19) Housakeeping pad locations are not tinalized. They will be bonded to <br /> the floor slab with an epoxy bonding agent. Any equipment anchors will <br /> extend into the structural slab. <br /> 20 - Sectlon D/SS503. Thls sectlon is cut at Lines 8 and 10 at the Fitth Floor <br /> when the floor elevation chanpes. Per calculatlon sheets 38 and 37 of the <br /> No�th/South Connection Design c�iculatlons, the vertical bracing on Linet <br /> 8 and 10 will penetrate the lower floor elab. It seems the detalls given In <br /> th� calculations or other detall� for these penetratlons are missing irom <br /> the drawing�. <br /> 20) The notch in the iloor slab edge to allow the diagonal bracing to pass by <br /> at column lines 8 & 10 is shown and dimensioned on the floor slab plan <br /> Sht. �5S501. <br /> 21 - Detall 7/CWS501. Detall D/CWS502 is called out. There does not appear <br /> to b� such a datail on Sheet CWS502 at this time. Perhaps A/CWS502 is <br /> Intanded. � <br /> 21) The reference Section D/CWS:i02 will be added to the Section <br /> A/CWS502 for proper reference. <br /> 4 <br />