Laserfiche WebLink
PLANNING AND <br />COAIAW V/TY OEYELOPMENT <br />r <br />August 27, 1991 <br />F.M. Stewart <br />Senior Engineering Manager <br />Boeing Commercial Airplane Group <br />Everett Division <br />P.O. Box 3707 <br />MS OH-24 <br />Seattle, WA 98124-2207 <br />Re: Boeing Master Development Plan Conditional Approval <br />Dear Fred: <br />The City has reviewed the revised Master Development Plan, dated <br />July 31, 1991, which was submitted in accordance with CoonnddiittIon <br />V.A.l.a. of, THE DECISION OF THE CITY OF EVERETf <br />MITIGATION PURSUANT TO SSPA C.( THE EXPANSION OF THE <br />BOEING/SVERE7'1' AIRPLANE MANUFACTURING FACILITY, dated July 3, <br />1991. This document is referred to in this letter as the <br />Decision Document. <br />The Responsible official finds that, with the following <br />conditions, the revised Master Development Ilan is <br />ingeneral <br />al <br />conformance with the Decision Document, fod is the approved Boeing/Everett <br />as <br />conceptual master development nare ras follows: <br />Facility. The conditions of approval <br />The sixty (60) foot wide wildlife corridor along etween <br />property boundary with as n prescribed in Condition <br />Wetlands B and C, <br />V.B.2B.b.(3), is extended to the west to connect to the <br />Sixty (60) foot wide, north-south, <br />f wildlife <br />Buildicorridor <br />adjacent to the Fluke property 40-95. <br />east <br />1. <br />Location: 2731 Wetmore Avenue <br />CITY OF FVFRFTT • 1002 Wetmnre • Fverett WA 98201 • (206) 259.8731 • Fax t2061 259-8742 • Scan: 723 8731 <br />