Laserfiche WebLink
August 8, 2012 <br /> Steve Miller <br /> Ciry of Everett <br /> Code Review <br /> Building 40-40— Lighting Camera Lab <br /> Everett, WA <br /> SUBJECT Bullding 40J0— Llghting Camera Lab <br /> Pertnit Correction Notlee Reaponse <br /> The Boeing Company, Everett Site <br /> Dear Mr Mdler <br /> We are m receipt o(your correclion notice dated July 26, 2012 regarding Plan Check <br /> Number 81207-025 We would like to respond lo the correction notice as follows <br /> 1 lhe plans mdicate a total of 29,820 square feet oi type V-8 spnnklered <br /> construchon. Also indicated are(uture modular buddmgs along the east and <br /> north sides. Smce ihe modular buildmgs are localed at what appears lo be 5 <br /> feet away from the 40-40 building, lhey should also be mcluded in the allowable <br /> / aclual area calculaUons in accordance with IBC 7-5 3 Alternatively, Ihe <br /> ezterior walls must be shown to comply with IBC 602 and 7-05 Please provide <br /> an analysis. <br /> Response: <br /> We propose that the mam bwldmg, the exterior modular and the connector <br /> between the exterior modular and Ihe mam bwlding are counted together as <br /> one slructure <br /> Buddinq area atlowed <br /> The basic allowable area for the buildmg per table 503(or an F-2 Occupancy, <br /> Type V-8 one story structure is as follows <br /> 13.000 square feet basic a�ea/ 1 story <br /> 13 000 sauare leel x 3 = 39 000 sauare feel spnnkler mcrease(sechon 506 3� <br /> 52,000 square(eet bullding area allowed <br /> Building area proposed <br /> 142' x 210' = 29,820 square (eet Mam Budding (mcludes Intenor Modular) <br /> 3,480 square feet Extenor Modular(3D'x 116') <br /> 5' x 6' = 30 sf Connector <br /> 33,330 square feet bullding aroa proposad <br /> Please let me know il you have any questions or comments regardmg this response <br /> Thankyou, <br /> S�zan Group, Inc. <br /> Mitch Yockey, AIA, LEED AP <br /> Pro�ect Manager <br />