My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-404 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-404
>
3003 W CASINO RD BLDG 40-404 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 10:58:00 AM
Creation date
1/26/2017 10:09:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-404
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; � � <br /> . i <br /> � DAMES 6: MOORE ,�,,.�_. ., �.,.;,,_ ,,....��� - <br /> _ ,; ,-i . � , � ,;� , . i,,,, -..�.. ,� ,, .; i ;, .. , ,.. . . ,,. <br /> Octaber 7, 1987 <br /> The Sceing Company <br /> P.O. Box 3707 <br /> M/S OH-26 <br /> Seattle, Washington 98124 <br /> Attention: Mr. Aichard Peazce <br /> Gentlemen: <br /> Confirming Proposal <br /> Geotechnical Investiqation <br /> Proposed Office Butldir�g <br /> Boeing Everett Site <br /> INTRODUCTION <br /> This let;:er confirma yuur verbel authorization for geotechnical <br /> investigations et two buildinq eltes at the Boeing Everett facility. <br /> The acope of our sarvices was developed through conversations with Mr. i <br /> Ed Eaiser of The Soeing Company and the un8ersiqned. I <br /> As requeeted, Dames i Noore conducted a site exploration program at <br /> the proposed building s1te, located southeest of existing Building 40-81 <br /> (Site I). After learning thet the eite hed been move8 to e location <br /> southwest of Bi�,ilding 40-81 (Site II), n subsequent site exploration <br /> proqram wns conducte9. <br /> We underetand thet the proposed building (Site II) will be a tem- <br /> porary pre-fabricated wood-frame etructure thet vill remain in eervice <br /> for a period of 1 to 2 years. From diacu6siona with Mr. Herold Adams of <br /> the Everqteen Compeny, we understend that the pezimeter wall deed loada <br /> will be on the order of 1,200 pounds per lineal foot, with interior <br /> column dead loads of about 10 kips. We understand that the building <br /> foundation is deaigned based on an ellowable benring cepecity of ebout <br /> 2,000 pounds per equare foot fpsf) . The etzucture will be placed near <br /> exieting eite grades. <br />
The URL can be used to link to this page
Your browser does not support the video tag.