Laserfiche WebLink
E159028 <br /> March 23, 1994 <br /> Page 2 � <br /> 2. Control Tranafoxmer Overcurrent Protection - The panel <br /> was provided with 2 control transforniera rated 50VA and 75VA <br /> reapectively; Per paragraph 13.7D-1, the 50VA transformer <br /> must be provided with primary avercurrent protection not to <br /> exceed 1/2 Rrtg� and the 75VA transfornier with primazy <br /> overcurrent protection not to exceed 3/4 Amp. <br /> 3 . N13rkiIIgfl - The following required markings were not , <br /> pravided on the panels: <br /> A. Panel Nameplate markings indicating the full load <br /> artg� rating, frequency and number of phasea of the supply <br /> circuit. <br /> B. FUse Replacement markings indicating the <br /> replacement fuse type and ratings for each fuse pravided in <br /> the panels. <br /> When the above items have been corrected, a follow-up viait <br /> can be arranged to verify the corrections and apply the <br /> Field Mark. <br /> This letter cortg�letes the work anticipated under Project <br /> 94SCO2263, and we are instructing our Accounting Department <br /> to close the project and imoice your ca�pany for the <br /> charges accrued. <br /> Very truly }roura, Reviewed By, <br /> �.�� �.?������ <br /> (�Il2IS SPICl�R NATE CADITAN <br /> Manager Engineering Team Leader <br /> Local Enyineering,Servicea �gineering Services <br /> Engineering Division Section 316J <br /> � cc: Mr. Tim Alaniz <br /> City of Everett <br /> Dept. of Public Worke <br /> 32U0 Cedar St. <br /> Everett, WA 98201 <br /> I <br /> I <br /> I <br /> � <br /> I <br /> I <br />