Laserfiche WebLink
September 2, 1992 <br /> paqe two <br /> 4 . Bulfer Planting. If any construction activity occurs within <br /> the required buffer for Wetland H or Stream A, a <br /> revegetation plan must be submitted to and approved by the <br /> Planning Department prior to issuance of buildinq permits. <br /> Such a plan must be prepared by a qualified wetland <br /> biologist. This may also entail additional review under <br /> SEPA, since it wes not addressed in the Master Plan. <br /> 5. Netlend Hydroloqy. Boeing has agreed to calculate the <br /> quantity of runoff to Wetland G and H and Stream Corridor A <br /> occurring under pre-construction conditions (native <br /> vegetation cover) , and deslgn the building roof and roof <br /> drains to supply the equivalent amount. <br /> The above issues ahould be addressed by revisinq the building <br /> permit application. Please contect Stephen Stanley or me at <br /> 259-8731 should you have any questions or comments. <br /> Sincerely, � , � <br /> �' � /// <br /> �...�f X l/ �(/_ <br /> avid Tyler, 1►ssociate Planner <br /> cc: Kirk Brooks, Public Works Dept. <br /> Stephen Stanley <br /> Gary Doughty <br /> enc. <br />