Laserfiche WebLink
PLANN/NG AND Paul A. Roberts <br /> COAlMUN/TY D�i�ELAPAlE/�IT' o��e��o� <br /> � <br /> September 2, 1992 /� <br /> C% Y,�"� <br /> Leonard Astemborski a <br /> Boeing Support Services D <br /> P.O. BoX 3707 , M/S OF-'16 ��� " SFp �31g �� <br /> Seattle, WA 98124-2207 CjTy• .. ........... 92 <br /> �'°b/! �F F�•.............. <br /> RE: Boeing Bldq. N40-41 Plan Review ° W� FRFj """•• <br /> Planning Dept. Comments ks�ep1 r <br /> Dear Leonard: <br /> The Planning Department has conducted a review of the plans for <br /> building M40-41 submitted to the City for review on July 27, 1992 <br /> (civil set) . The following issues were raised durinq this <br /> review: <br /> i. Setbeck fro� stree� corridor 11. Page 21, condition 1.1 of <br /> the Decision Document for the Master Plan specifies a 25 <br /> foot setback beyond the top of any slopes 25$ or grenter <br /> that are asaociated with a stream. The attached exhibit A <br /> indicates that the slope directly above and east of Stream A <br /> and Wetland H is a 33� slope. This slope extends east into <br /> an area shown as being developed with a retaining wall and <br /> roadway. This development proposal is not consistent with <br /> the terms of the Deciaion Document. Because Boeing nppeared <br /> to be in the process of initiating work at the top-of-slope, <br /> this issue is of critical importance. <br /> 2. Identification of Netlanda. The plans do not identify the <br /> wetlands and streems by their 1► through Q desiqnators as set <br /> forth in the EIS and Wetland Mitiqatlon Plan. These should <br /> be included on any revised plans. <br /> 3. site Plan and Mitiqntion Plen Consistency. The Attnched <br /> Exhibit B, from the Wetland Mitiqation plan dated Auqust 6, <br /> 1992, shows eurface parkinq to the west of Bldq. N40-41 <br /> which would result in the fillinq of Wetlsnd H and Stream <br /> Corridor 1►. In addition, this same parking area extends to <br /> the edge of Wetland G. The Decision Document states in <br /> condition 1.1 that Stream A and associated wetlands (H) <br /> shall be protected. Wetland G is required to have a 50 foot <br /> buffer, plus a l0 foot construction setback. This <br /> inconsistency must be rectified. <br /> Location:2731 Wetmore Avenue <br /> CITY OF EVEREI"f•3002 Wetmore• Everett, WA 98201 • (206) 259•8731 • Fax (206)259-8742•Scan:723-8731 '� <br />