Laserfiche WebLink
September 2, 1992 <br /> page two <br /> 4. Buffer Plantinq. If any construction activity occurs within <br /> the required buffer for Wetland H or Stream A, a <br /> revegetation plan must be submitted to and approved by the <br /> Planninq Department prior to issuance oP buildinq permits. <br /> Such a plan must be prepared by a qualified vetland <br /> bioloqist. This may also entail additional revieK under <br /> SEPA, aince it was not addressed in the Master Plan. <br /> 5. Metland 8ydrology. Boeing has aqreed to calculate the <br /> quantity oP runoff to Wetland G and H and 3tream Corridor A <br /> occurrinq under pre-construction conditions (nntive <br /> veqetation cover) , and desiqn the buildinq roo! and roof <br /> drains to supply the equivalent amount. <br /> The above issuea ahould be addressed by revising the building <br /> permit application. Please contaa� Stephen Stanley or me at <br /> 259-8731 ahould you have any questions or commenta. <br /> s//i-�n�cerely, /� <br /> a�' Gu�K.I' i'• �� <br /> Tyler, 1►ssociate Planner <br /> cc: Kirk Brooks, Public Works Dept. <br /> Stephen 3tanley <br /> Gary Douqhty <br /> � • enc. <br />