Laserfiche WebLink
Exhibit "B" <br /> Approved Master Plan Expansion Phases <br /> (See Attached Maps) <br /> Phase 1: Completed and opened in 2002. <br /> Expansion of the Pavilion for Women and Children, located at the Pacific Campus. <br /> Phase 2A Proposed Completion in 2007 <br /> Develop and construct a community cancer center in partnership with local physician groups. As <br /> part of the cancer center, the facility will provide medical physician office space and a 600 car <br /> parking garage. This phase proposes the demolition or moving 21 of 22 Donovan homes in the <br /> Donovan District for temporary surface parking and construction staging. <br /> Note: A Special Property Use (SPU) permit will be required for the cancer center and parking <br /> facility, which will include a review process separate from this docket request,or PEMC may <br /> use the institutional overlay depending on outcome and timing of the decisions. <br /> Phase 2B Proposed Completion in 2007 <br /> Expand emergency department and operating room capacity. <br /> Phase 3 Proposed Completion in 2010 <br /> Construct an expansion to the hospital bed tower 1 on the site of the existing parking <br /> garage. The structure would house beds for radiology, surgery, sleep services, intensive care, <br /> respiratory and medical nursing patients. The building would also house labs and a pharmacy. <br /> Before the parking garage is removed, new parking (600 potential stalls) would be <br /> provided in the expansion area to the east, with another 300 replacement stalls proposed on the <br /> existing campus. <br /> Phase 4 Proposed Completion in 2015 <br /> Construct a replacement bed tower(a"replacement hospital") on the eastern expansion <br /> site. This structure would house beds for rehabilitation, chemical dependency, telemetry, <br /> medical and surgical patients, as well as necessary critical support functions. <br /> - 8 - <br />