Note that the till soil at the site is sensitive to changes in moisture content and an be easily <br />disturbed when exposed to water and construction traffic. Care should be taken during <br />construction, particularly during the wet season. Even with precautions, we expect that some <br />portion of the till will require removal and replacement during the compacted filling <br />operations or subsequent excavations where moisture conditions exceed optimum levels. <br />The material should be a well -graded and or sand and gavel with <br />less than 5 percent fines. The material should not content any organic stutter or other <br />deleterious materials. <br />The fill should be pieced in boa lifts not exceeding 6 to t inches <br />and compacted to at lent 95%of maximum dry density based on ASTM-1557 test procedure. <br />6.0 RECOMMENDATIONS - EXISTING STRUCPURS <br />We understand that some heavy, settlement-ses aitive machines ers to be installed in the <br />existing building 40-56. Augerart piles an proposed for the support of the machine. Pile <br />apecities of 40 to 50 tons per pile an be used for preliminary design purpose. The piles should <br />be at least 16 inches in diameter and they should be placed with at Nest 48 loches specing. The <br />piles should bear in natural glacial till, the depth of which will vary within the building. Detailed <br />design parameters and recommendation an be provided when the baton and lading <br />information become available. <br />••005.00695.016\sao10r00.aV <br />00695.509.016 21 <br />