My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-56 Geotech Report 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-56
>
Geotech Report
>
3003 W CASINO RD BLDG 40-56 Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:17:33 AM
Creation date
1/26/2017 12:02:02 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-56
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A California Bearing Ratio (CBR) value of 20 may be used for design. If Portland Cement <br />Concrete pavements are considertd, the modulus of subgrade reaction, k, may be taken as 250 <br />pounds per cubic inch (pci). <br />5.8 SITE PREPARATION <br />As previously mentioned, at least 2 feet of select fill should be placed underneath the slab. <br />This may require some cutting at the southern end of the expansion. For the area in fill, the site <br />should first be stripped of asphalt pavement and bus course said any underground utility Bees <br />should be relocated. Any soft soils exposed at the surface should be overoxavated. After <br />stripping and cutting to tom, the entire site should be proof -roiled by a pneumatic -tired device <br />such as a loaded tandem -axle dump tr6ck to detect any yielding area which should be further <br />overoxavated. The proof -rolling should have 100%coverage and should be conducted under the <br />visual inspection of Dames A Moore's geotechnial engineering personnel. <br />After proof -rolling and inspection approval. structural fill am than be placed. The structural <br />fill up to 2 feet below floor slab an be till or other approved soil fills. Select fist should be used <br />from there and up to the slab subgrade. The criteria for the till OW select fills are listed below. <br />The material should be placed in loose lifts not exceeding 6 to g <br />inches and compacted with the following criteria: <br />Density: A minimum of 95% of maximum dry density based on <br />ASTM-1557 test procedure. <br />Moisture: Wtthtm 2% below and 1% above Optimum Moisture Content <br />(ASTM-1557) <br />• • 00S • 006" - 016\ua0r00. erp <br />006"-s".0% 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.