My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-01 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-01
>
3003 W CASINO RD BLDG 45-01 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 4:15:03 PM
Creation date
1/26/2017 1:21:50 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-01
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 24, 1995 <br /> �iLti'UTES OF 111EETING NO. 63 <br /> BOEING COMAtERCIAL AIRPLANE GROUP <br /> BUILDING 45-01 <br /> PAINT HANGAR RENOVATION <br /> EVERETT, WASHINGTON , <br /> N.O. 95-5629D <br /> DAT�: August 24, 1995 <br /> LOCATiON: Bceing Everett ;.� '� <br /> The Austin Connam `� <br /> ATTENDEES: �6 Steve Lusk ''' <br /> Wayne Henkel ;`,yy <br /> leff Hollingsworth Nick Schmitz <br /> Jeff Turk ;, �`'�� <br /> Bruce Babcock �� . <br /> Keith Carlson Terry Palmer <br /> L,eonard Astrmborski <br /> Citv of Everett <br /> Tim Tyler � <br /> Dave ;vlisner <br /> Tim Alaniz <br /> Brian Waugh <br /> Warren Baty <br /> Steve Miller <br /> The pucpose of this meeting was to review the project scope of work and code issues <br /> with the City of Everett Building Department personnel. The following is a summary of <br /> items discussed. <br /> 1. Wayne Henkel presented an overview of the project scope and code issues. (outiine <br /> attached) <br /> 2. Recirculation of process ventilation air will be invodaced in this faciliry during the <br /> curing cycle only. There w��l Will be a minimum of 2596 outside sir invoduced at all <br /> times during this cYcle• There is 100% outside air during tt►e painc cYcle and for a i <br /> period of time before the curing cycle begins to purge the flashing off of solvec►ts from <br /> the pnint. Boeing hac reviewed the system operation and quantities of VC� in the <br /> eirstream end determined that the LE?, levels are not approached under any <br /> circumstances. (Copy of leff Hollingsworth memo of August 18, 1995 is attached) <br /> Bceing submitted copy of Bxing's 1990 study of paint hangaz sir quality, summary of <br /> LEL levels based on maxinmm use of paints a��d solvents for the City to review. <br /> I <br />�l <br />
The URL can be used to link to this page
Your browser does not support the video tag.