Laserfiche WebLink
8. The contractor must provide the Fire M2rshal w�th specifications for <br /> tanks, piping, dispenser5 and lead detect�on equipment, or any other <br /> special equipment prior to installation. <br /> 9. 7he proposal must also comply with all other City Code and Ordinance <br /> requirements not specifically set forth herein. Including city Building <br /> Code and Sprinkler code. Building Permits are required for the <br /> structures including the containment wall. <br /> 10. The 200,000 galion tank must be Instailed i�t compliance with Uniforn� <br /> Fire Code 1991 Edition, Article 79, Division V. <br /> 11. The proposal will need to comply with the City's cross connection <br /> control and industrial pre-treatment regulations. <br /> 12. A spill response plan sliall be submitted and approved by the City prior <br /> to issuance of a butlding permit. <br /> 13. The tanker transfer areas and above ground storage tank installation <br /> shall comply with all applicable City standards. <br /> a <br />