Laserfiche WebLink
_ _ ----��� <br /> .� <br /> Page 5 <br /> 7. 1.3 The following information is required to complete <br /> • evaluation of this equipment: <br /> (1) Certified copiea of manufacturer�s production <br /> test reaults. <br /> , (Z) Vendor drawings for the 15kV circuite at <br /> Substation 45 and 46. <br /> Reference: ANSI/IEEE C37. 20. 3 Par. 4. 1, 5. 3 <br /> Reported: 5/3/93 <br /> • Corr�at�a= The required information has been <br /> received and reviewed by our office. No additional <br /> modifications are required. <br /> . vr�ti•a� 5/12/93 <br /> 6.0 EOOIPMENT RV�r.p�TIONt <br /> � e . l Syatem Deacription I <br /> The equipment inspected coneiste of two (2) dual feed <br /> switch units manufactured by Siemens Energy and <br /> Automation, which provide primary power to Substations <br /> 45 and 46 at Fuel Docks F4 and F5 of Boeing�e Everett <br /> Facility. Each dual feed switch unit contains two (2) <br /> UL recognized loadbreak interrupter switches <br /> manufacturer by Powercon Corp. <br /> • 8 . 2 Groundinq <br /> Exposed non-current carrying parts of the equipment <br /> were verified (electrically and visually) to be <br /> effectively grounded. <br /> 8. 3 Guarding of Live Parts <br /> All internal components are enclosed in grounded, metal <br /> enclosurea. <br /> 8• 4 Overcurrent Protection <br /> Overcurrent protection for the receptacle outlets, <br /> lightinq fixt�res, and space heater circuits installed <br /> in the switch assemblies was inspected for compliance <br /> with the codes and standards listed in Section 4 . 0 of <br /> this report. No discrepancies were noted. <br />