Laserfiche WebLink
HE�C <br /> ENGINEERS <br /> 1 <br /> A PROJECT DESCRIPTION <br /> The proJect site for the Rafl Recelval Faciltty (s at the <br /> southwest corner of the North Complex (the area north of <br /> State Route 526) at the Boeing Everett plant. The pro)ect has <br /> been broken into four construction document packages. A <br /> descrlptlon of the worl, !n each package is as follows: <br /> 1. Slte Dtsplacement Package ( by BE&C Engineers ) <br /> a Provide parktng tn the area of the two exisUng <br /> ballffelds to replace parking dlsplaced by this � <br /> proJect. <br /> b. Relocate exlsttng trafflc corrtdors to permanenUy <br /> reroute vehlcles/pedestr►ans currenUy using routes <br /> dlsplaced by this pro)ect. Thls work includes: <br /> 1 ) Provtde security fence 16 feet south of the <br /> southerly track relocatlon. <br /> � ) 2) Replace tratn gate to �ust east of west <br /> perimeter road. <br /> 3) Relocate east/west road that parallels existtng <br /> southerly track, immediately south of f^-+ce. <br /> 4) Provtde delivery truck parking area south of <br /> Cence at west Perimeter Road. Include <br /> installadon of a phone ]ine and electricity to a <br /> phone booth << thls locatlon. <br /> 5) Revise alignment of West Per(meter Road so <br /> that new rail grade crossing does not occur on <br /> a switch. <br /> 6) Relocate gate E-70 and assoctated security <br /> post, including entry road, pedestrian <br /> turnstlles and a bus stop to a new locatlon <br /> fronUng on West Perimeter Road southeast of <br /> BuAding 40-05. <br /> , ,> <br /> �a <br /> mJc:326-91239-CAI.G 1 <br /> 12/10/91 <br />