Laserfiche WebLink
HE�C <br /> ENGINEERS <br /> , <br /> 2. Track Relocation Package ( by Delta Rail ) <br /> a Construct a new lead and passing track. <br /> b. Construct slx new turnouts. <br /> c. Dismantle replaced track and six turnouts. <br /> 3. Bullding Package ( by BE&C Engineers ) <br /> a Construct Building 40-55. This work Includes: <br /> 1 ) Load/Unload Building (12,500 square feet). <br /> 2) Covered loading dock attached to building on <br /> north slde. <br /> 3) Offlce on northeast corner of loading dock <br /> (3,000 square feet on two floors). <br /> 4) Concrete staging pavement east of above to <br /> support straddle carrler and TME's (200,000 <br /> � squaze feet). <br /> 5) Associated buildtng site and utillties work. <br /> 4. Building 'IYack Package ( by Delta Rail ) <br /> a Construct turntable track, turntable and one <br /> turnout. <br /> b. Construct repair track and one turnout. <br /> c. Construct tive dock tracks and Cour turnouts. <br /> d. Construct three Roor level tracks and two turnouts. <br /> e. Dtsmantle the replaced track. <br /> � <br /> ' l <br /> m)c:326-91239•CAI,C•1 <br /> 12/10/91 <br />