My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-56 SITE DEV 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-56 SITE DEV
>
3003 W CASINO RD BLDG 40-56 SITE DEV 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:54:56 PM
Creation date
1/26/2017 3:20:42 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-56 SITE DEV
Permit
PW 91-278
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° _ DAhiES & MOQRE <br /> SSOE, Inc. <br /> July 27, 1992 <br /> Page 3 <br /> AUGERCAST CONCREfE PILES <br /> A total of 10 augercast concrete piles were installed to support ihe Elevator Pit located between <br /> Columns F and G trom IJne 5.1 to 5.5. An additional 9 augercast concrete pfles were Instelled to <br /> support the CO2 Tank near Column CC�. The pfles were 18 Inchea in dlameter, embedded at <br /> least 3(eet into the natural glacial till sofl and had an allowable downward capacity of 50 tons. The <br /> piles were Installed by Malcom Drilling using a G•KLEMM 806D or 807D drlll rig and a Trenscrete <br /> Sidewinder grout pump. <br /> Our representative was present during pile Installatlon to record pertinent data Including the cast <br /> length of the pile, ihe theoretical hole volume,the actual grout take, the grout pump pressure and <br /> the head of grout In the auger. locatlon, alignment and grade Information was provkled by Wright <br /> Schuchart Harbor Co. A summary ot the data for all piles monitored Is presented on Table 4(or <br /> the Elevator Pit and Table 5 lor the CO2 Tank. Dames & Moore was not present during the <br /> Installatlon of piies No. t and 2 at the CO2 Tank. <br /> FLOOFi SLAB <br /> Floor slab support was provfded on•grade afler preparatfons which included surcharging o(an <br /> area approximately 4000 square feet in dimension and placement of a 2 foot thlck layer of select <br /> compected fill soil. The surcharge was located as shown on Plate 1 corresponding to an area <br /> designated by Dames& Moore as being underlaln by organlc((II soiis. The surcharge was placed <br /> to minimlze post-construction settlements of the slab. The surcharge was roughly 16 to 18 feet In <br /> height, remained In place for 25 to 30 days, and induced settlements ra�ging(rom 3 to 7 Inches. <br /> The surcharge remained In piace until Dames 8 Moore concluded that over 90 percent of the <br /> anticipated settlement had occurred and that the ob�ectives of the surcharging program had been <br /> achleved. Surveying o�settlement plates was provided by Wright Schuchart Harbor Company. <br /> Our representatives were on sfte to monitor the preparatlons (or and placement o( the <br /> surcharge, ihe monitoring of settlements Induced by the surcharge and monitoring ot compacUon <br /> ' of 1111 solls(or the slab subgrado. The select fill for the upper 2 feet of the subgrade conslsted ot <br /> a 'pft run' and/or'screenings' material from Associated Sand 8 Gravol. Laboratory compaction <br /> tests and tleld density testing were provided by PSI, Inc. The Dames & Moore representetWe <br /> � � monitored the siripping ol asphalt and the proo(-rolling of exposed suriaces, and evaluated the <br /> overall quality of the fill materlals and the completed compacted (ill product. So(t areas were <br /> removed and replaced. All till within 4(eet below the bottom of the sleb was compacted to at least <br /> 95 percent of the maximum dry density. <br />
The URL can be used to link to this page
Your browser does not support the video tag.