My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2416
>
1993 REMODEL
>
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:41:57 PM
Creation date
1/27/2017 2:14:28 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2416
Tenant Name
1993 REMODEL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-. <br /> SNOHOR i� ;e.���qrn��ua�,ctfeannorSr,onom,snG� ��n�,�. ,:�����,;..�, .,,; <br /> � HEALTH ��, ; .,�s <br /> i <br /> DISTRICT �'•WAPD HINDS,M.D., 11.p,H, <br /> - �earcn onc�er <br /> vita151aus�w i2p61339�5280 AtlminislreuonC!!�ce <br /> CbmcSercite 12061339�52.'0 CommuroryHeae'+D�.�,,,,n "6�:7a�5210 <br /> SamlanonP.opr�m i206�3J9�52iC EnvnonrienlaiNea::hDi��s�,cn �^�p�,7�g.�-t� <br /> HN�AiGSProqrrm .^.CG1339�5251 FFa <br /> ^Ocl 739�c:18 <br /> May 26, 1993 � � � LS � �� D <br /> JUN - 1 1993 <br /> H. Richard Heindel <br /> CITY OF EVERETT ~ <br /> The Dykeman Architects PubNc Works Dept. <br /> 1602 Hewitt <br /> Everett, Washington 98201 <br /> Subject: Everett High School Remodel • <br /> Everett School District <br /> Dear Mr. Heindel: <br /> Plans and specifications for the above noted school, received May 21, 19g3, have <br /> been reviewed. They appear to meet with the provisions of the state's school <br /> reguiations (WAC 246-366), and are approved. <br /> Priur to occupancy, please contact me to perform the preoccupancy inspection as <br /> required in Section 250(2) of WAC 246-366. <br /> At the time of the preoccupancy inspection, a written statement from your HVAC <br /> engineer stating the ventilation systems meet the NC-35 noise requirement must be <br /> submitted. <br /> Apparentiy, the school is to be occupied while construction is to continue. Due to <br /> potential health and safety problems presented by this type of situation, the <br /> Snohomish Health District has estabtished Const;uction Gu;delines for Occupied <br /> Schoo/ Buildings. This will require that: <br /> A) A safety plan be submitted to this office that includes: <br /> i) Plans for safe access and egress to all student areas, <br /> ii) Effective barricades of unsafe areas, <br /> iii) Patrolling of the work site to insure student safety, <br /> iv) Identification of the most hazardous areas, <br /> v) Designation of a responsible person for plan implementation, <br /> vi) Establishing a reporting procedure wherein all occupants, including students <br /> and staff, may report to the school district any contaminants, odors, air <br /> pollution, excessive noise, poor lighting, safety hazards, or any other unsafe <br /> or unhealthy procedures or situations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.