Laserfiche WebLink
, <br /> Mr. Richard Heindel I <br /> The Dykeman Architects <br /> May 21, 1993 <br /> Page 3 of 3 ' <br /> In order for the processing of your application to continue, it will be necessary to <br /> pmvide the Building Division w�th two complete new se�s of drawings reflecting the <br /> corrections reyuested. <br /> Upon resubmittal of the drawings, your application will be given priority and plan <br /> review recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to � <br /> ensure that the proposed structure will be conswcted in compliance with all adopted <br /> cades. <br /> Sincerely, <br /> f . Mc ! <br /> Associate Engineer/Building <br /> 1SM:jVm-pinck2 <br /> SA�N7 <br /> i <br /> ;�y <br /> i <br /> I <br /> � <br /> � <br /> �i <br /> 1 <br />