My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2416
>
1993 REMODEL
>
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:41:57 PM
Creation date
1/27/2017 2:14:28 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2416
Tenant Name
1993 REMODEL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . MF,�Ae[I�AMERICAry IN5717UiE OF ARCHRfCiS � <br /> V �' <br /> o � 8.CRAIG THOMPSON <br /> � _ \ O � � � a � � O K.JOHN JONES <br /> � A. GARV O'LEARY <br /> N / � JOEL O. NIEMI <br /> � U U JUN - 31993 <br /> ° r"E DYKEMAN ...... <br />'1 c ARCHITECTS ��CITY Of�EVERETT� <br /> a Public Works Dept. <br /> June 1, 1993 <br /> Mr. Jeffery S. McFall RE: Everett High School <br /> Public Works Department Modernization of Main Buildinq <br /> Building Department Plan Check No. B40475 <br /> 3200 Cedar Street 92-018 <br /> Everatt, WA 98201 <br /> Dear Jeff: <br /> In follow-up to your letter of May 21, 1993, you, Tim Tyler, and � <br /> I met to review the letter and dispel oL resolve the items of <br /> concern. The following is our understandinq of the results of <br /> that meeting. The response is in the same numbered order as your <br /> letter. <br /> � l � 1. It wa agree +that a re-submittal of the plans is not <br /> necessa required because of the following resolutions. <br /> ('I�Ul��2 The underside of the floor or ceilinq joists shall receive <br /> �1 5/S" type 'x� GWB and steel beams and columns above <br /> �7b ��w`'�� suspended ceilings shall be fire proofed for a 1 hour <br /> rating. <br /> . 3. It was explained that because of the configuration of the <br /> existing building and casework in the rooms typical <br /> classroom arranqements could not be created. The District <br /> � program requested 32 students per classroom. We have � <br /> enclosed a copy of a study made for the Schpol District that���� <br /> indicate the o timum student occu ant load er room on the <br /> third floor. Note t e c rculat on space n e room mus�be� �,� .�� <br /> >n3 ained for movement of students and equi ment. The G� <br /> number of com uter stations was reduce o ve per room in <br /> lieu of_six�. ,{ e compu er s a ons s a e occu ed b � <br /> � students for the normal student load. Not in addition to <br /> �f� �' the normal load.—�e occupan oa or th3a,.€lo� �,tp(1� <br /> �� including teachers, will be approximatel 428.� The 5f���U <br /> n e w sp ap e r p r o d uction room A3o2 will be oc�c pied by students 4�J <br /> from classroom A301. Note that from an educational room � <br /> orientation and the limits placed by the r a�cenfiouration <br />'� the-riiLmber of student sez�ts_is limited. It was agreed t—ha <br /> because the stairs are as narrow as ey are a handrail in I <br /> the center would be deleterious to student traffic flows. 1 <br /> J <br /> 4. This is answered by (2) above. / <br /> L� � eP��� -- � �? <br /> �w� �� � �� ����� <br /> � �s�`�e, <br /> � <br /> i 400 FIRST NATIONAI BANK BUILDING 1602 HEWITT qVENUE EVERETG WA 98207 206�2593161 FAX 206d21•1831 <br /> i • <br />
The URL can be used to link to this page
Your browser does not support the video tag.