My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2416
>
1993 REMODEL
>
2416 COLBY AVE 1993 REMODEL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:41:57 PM
Creation date
1/27/2017 2:14:28 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2416
Tenant Name
1993 REMODEL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� • . <br /> ^ <br /> �. <br /> Mr. Jeff McFall <br /> 5&6. In an effort to work with the pa4e 2 <br /> ���/�G� accessible plan for disabled existi.nq 8ite and structure an <br /> �� ��;N14� plan had to coordinate with safet�ns was developed. This <br /> +F+�� District. Public parkinq for the disableduisteastaof Colbye <br /> Avenue (existin <br /> � �� at Hoyt Avenue as and new parking west of the main buildinq <br /> � east of Colb part of this project. The <br /> P� Y Avenue is for the auditorium andaWill most�g$ <br /> ��'I� buildinnot be used by the public who would fre <br /> � <br /> the main�buildingiwili besstudentser of the easteentry ofain <br /> keys to the elevator and vestibules, They wiil be issued <br /> ring a buzzer in the office will be A button that will <br /> disabled public visitor to used by that infre <br /> elevator. The north and south doorssto�t eemaintbuildinqdt <br /> will have a sign to indicate a non accessible ent <br /> disabled. The west entries will be the entries <br /> the disabled public, r'Y for the <br /> on the west and obtainTaekeybfor the administration offi eby <br /> which will allow them to use the elevator, parking <br /> this allows appropriate access to the We believe � <br /> and yet maintains ,safet students and that <br /> systems. Y and security of the Public <br /> ,{' E�levator <br /> (�L��• The entry stair has been chan ed. <br /> attached drawing 3A.1 3A.2 g please refer to the <br /> drawings. � . 3A.3. and sheet A3.1 of the <br /> ����j��IfB• A rail has been added a the east entry ramps, please refer <br /> � �r�`,'�( to the attached drawing. <br /> QI`++• Please refer to the <br /> drawfngs referenced ;n � <br /> � 10. Draft stops shall �e added � � above. <br /> walls between classrooms, ' in the parapet braced areas, at <br /> (6!� L•�' �tops will be more than lOOT pu�ally the space between draft <br /> - - - -li. _ -.The condYtio'n as drawn, with the bi.ildin <br /> (����M�j� and the staExistinosed at the thirci level, fwasY sprinklered <br /> -l�`'"��' aAproved. <br /> were carefull g buildinq conditions and trafficlflows <br /> y considered at that time. <br /> We trust that the above ahswers the concerna of <br /> haveeanly represents the aqreement made in our meetin <br /> y additional Your letter and <br /> questions please call. g• =f you <br /> The District will bid the project on June <br /> respectfully request the required letter of <br /> that date. $. 1993. We <br /> Thank you for your corporation, acceptance prfor to <br /> incerel <br /> H• Richard Heindel <br /> HRH/skb <br /> cc; Mike Gunn - Everett School District No, y <br /> file/routing <br /> Enclosure - , <br /> _ I <br />
The URL can be used to link to this page
Your browser does not support the video tag.